Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
118
FieldSmart
®
Fiber Active Cabinet (FAC) 900
Installation Manual
_________________________________________________________
Step 1:
Step 2:
Step 3:
To install a cross-connect panel
Unpack the cross-connect panel from the shipping package, and open the EXM door.
Mount the test tool holder on the (4) studs located on the interior door, and secure using (4) Keps nuts.
Note:
One test tool holder ships with each cross-connect panel; only one test tool holder is required per enclo-
sure.
At the right side of the cross-connect frame, partially insert (4) self-tapping screws, leaving a .25-inch gap
between the frame and screw as shown in the diagrams below.