81
FieldSmart
®
Fiber Active Cabinet (FAC) 900
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020420 REV B - April 2019
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7:
Step 8:
Step 9:
Step 10:
To install AC power (120/240 VAC)
Note:
Refer to the AC junction box wiring diagram (on Clearfield’s website, seeclearfield.com) for guidance. An AC wiring
label is attached behind the junction box front panel for reference
Open the front cabinet door.
At the customer supplied circuit breaker box, switch all breakers off.
Remove the right AC cover panel as follows:
a.
Remove the (3) mounting screws securing the cover panel to the fixture.
b.
Push up on the (2) lifting tabs, angle the panel away from the fixture, and lift the panel from the (3) capture
tabs on the bottom of the fixture.
From inside the AC junction box, push the plug out from the AC input hole and then install the supplied cord
grip and locknut.
Install a user-supplied AC conduit between the outside entry duct in the cabinet floor and the junction box entry
location. Install the conduit per local practice. Make sure the conduit is rated for AC cabling.
Pull the customer supplied AC wires into the cabinet through the duct entry in the base of the cabinet.
Route the AC wires to the rear of the AC junction box and feed it through the cord grip in the AC input hole.
Connect the AC wiring as follows:
•
Connect the ground (green) leads to the ground bus bar.
•
Connect the L1 (black) and L2 (white) leads to the terminal block positions: Rectifier Feed A, Rectifier Feed
B, GFCI Outlet, and (optional) Battery Heater.
Tighten the cord grip around the AC wires at the rear of the junction box.
Re-install the right cover panel on the AC junction box.