89
FieldSmart
®
Fiber Active Cabinet (FAC) 900
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020420 REV B - April 2019
Step 1:
Step 2:
Step 3:
Step 4:
Installing Metallic Cables
This section describes how to install metallic signal cables into the cabinet, including how to route and groom the outside
plant cables and splice to the equipment cables.
Removing the Battery Enclosure
For additional space in the cabinet or EXM compartment when installing or splicing outside plant metallic cables, remove
the battery enclosure as described below.
To remove the battery enclosure
Open the side cabinet or front EXM door.
Open the latch on each side of the terminal cover and remove the cover.
Remove the seismic retaining bracket from the battery enclosure as follows:
a.
Remove the temperature probe cable from the right upper hole in the retaining bracket.
b.
Remove the (2) hex head screws and washers from each side of the retaining bracket.
c.
Rotate the retaining bracket forward, and lift the bracket from the groove at the base of the battery enclo-
sure.
Remove the (8) mounting screws from each side of the enclosure, and lift the enclosure from the base of the
cabinet or EXM.