Verification Time and Date
Planning Activity
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the
equipment
Dedicated (separate)
circuits for power
redundancy
UPS for power failures
Grounding: proper wire
gauge and lugs
Circuit breaker size
Grounding evaluation:
Data center ground
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment
(transceivers)
EMI evaluation:
Distance limitations for
signaling
Site wiring
RFI levels
Contact and Site Information
Use the following worksheet to record contact and site information for the installation.
Contact person
Contact phone
Cisco Nexus 9396PX ACI-Mode Switch Hardware Installation Guide
62
Site Preparation and Maintenance Records
Contact and Site Information
Содержание Nexus 9396PX
Страница 22: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 64: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 54 System Specifications System Specifications ...
Страница 68: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 58 LEDs Power Supply LEDs ...