Width of the front clearance area (equal to the
width of the chassis with two rack-mount
brackets that are attached to it).
4
For the clearances required for a two-post rack installation, see the following figure.
Chassis width
3
Chassis
1
Service clearance that is required for replacing
the chassis (equals the length of the chassis).
4
Vertical rack-mount posts and rails
2
Both the front and rear of the chassis must be open to both aisles for airflow.
Note
Cisco Nexus 9396PX ACI-Mode Switch Hardware Installation Guide
11
Preparing the Site
Clearance Requirements
Содержание Nexus 9396PX
Страница 22: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 64: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 54 System Specifications System Specifications ...
Страница 68: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 58 LEDs Power Supply LEDs ...