Страница 1: ...ardware Installation Guide First Published 2014 11 07 Last Modified 2019 03 28 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 ...

Страница 2: ...e encouraged to try to correct the interference by using one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Modifications to this product no...

Страница 3: ...H A P T E R 2 Temperature Requirements 5 Humidity Requirements 5 Altitude Requirements 5 Dust and Particulate Requirements 6 Minimizing Electromagnetic and Radio Frequency Interference 6 Shock and Vibration Requirements 7 Grounding Requirements 7 Planning for Power Requirements 7 Airflow Requirements 9 Rack and Cabinet Requirements 9 Clearance Requirements 10 Installing the Chassis 13 C H A P T E ...

Страница 4: ...ther Devices 28 Connecting Leaf Switches to APICs 29 Connecting Leaf Switches to Spine Switches 30 Virtual Port Channel Migration Migration of Nodes from a First Generation Switch to a Second Generation Switch 32 Setting Up an Optional Console Interface 33 Setting Up an Optional Management Connection 33 Maintaining Transceivers and Optical Cables 34 Replacing Modules 35 C H A P T E R 5 Replacing t...

Страница 5: ... Power Supply Port Side Intake Specifications 50 930 W DC Power Supply Port Side Exhaust Specifications 50 Power Cable Specifications 51 Power Cable Specifications for AC Power Supplies 51 DC Power Cable Specifications 52 Regulatory Standards Compliance Specifications 52 LEDs 55 A P P E N D I X C Switch Chassis LEDs 55 Uplink Module LEDs 56 Fan Module LEDs 56 Power Supply LEDs 57 Additional Kits 5...

Страница 6: ...Chassis and Module Information 63 Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide vi Contents ...

Страница 7: ...text indicates arguments for which the user supplies the values Italic Square brackets enclose an optional element keyword or argument x Square brackets enclosing keywords or arguments separated by a vertical bar indicate an optional choice x y Braces enclosing keywords or arguments separated by a vertical bar indicate a required choice x y Nested set of square brackets or braces indicate optional...

Страница 8: ...vailable on Cisco com at the following URL https www cisco com c en us support cloud systems management application policy infrastructure controller apic tsd products support series home html Web Based Documentation Cisco APIC Management Information Mode Reference Cisco APIC Online Help Reference Cisco APIC Python SDK Reference Cisco ACI Compatibility Tool Cisco ACI MIB Support List Downloadable D...

Страница 9: ...dware Installation Guide Cisco Nexus 93120TX ACI Mode Switch Hardware Installation Guide Cisco Nexus 93128TX ACI Mode Switch Hardware Installation Guide Cisco Nexus 93180LC EX ACI Mode Switch Hardware Installation Guide Cisco Nexus 93180YC EX ACI Mode Switch Hardware Installation Guide Cisco Nexus 93180YC FX ACI Mode Switch Hardware Installation Guide Cisco Nexus 9332PQ ACI Mode Switch Hardware In...

Страница 10: ...ps www cisco com c en us support switches application virtual switch tsd products support series home html Documentation Feedback To provide technical feedback on this document or to report an error or omission please send your comments to apic docfeedback cisco com We appreciate your feedback Obtaining Documentation and Submitting a Service Request For information on obtaining documentation using...

Страница 11: ...t 10 40 Gigabit Ethernet module Fan modules three two for operations and one for redundancy 2 1 with the following airflow choices Port side intake version with burgundy coloring N9K C9300 FAN2 Port side exhaust version with blue coloring N9K C9300 FAN2 B Power supplies two one for operations and one for redundancy 1 1 with the following airflow choices 650 W AC power supply with port side intake ...

Страница 12: ... connections to spine switches 12 port uplink module shown 7 Chassis LEDs Beacon BCN Status STS Environment ENV 2 Notch in both sides of the chassis for locking the power supply end of the chassis to the bottom support rails 8 Two USB ports used for saving or copying functions USB support is limited to USB 2 0 devices that use less than 2 5 W less than 0 5 A inclusive of surge current Devices such...

Страница 13: ...from the fan side of the chassis Chassis LEDs are as follows Beacon BCN Status STS 5 Screw holes 2 for attaching the grounding lug 1 Screw holes 4 for attaching a center mount rack bracket for two post racks one bracket for each of two sides 6 Notch in both sides of the chassis for locking the fan end of the chassis to the bottom support rails 2 Screw holes 2 for attaching a front mount bracket fo...

Страница 14: ...n coloring For port side exhaust airflow the fan and AC power supplies have blue coloring DC power supply modules have gray coloring The fan and power supply modules are field replaceable and you can replace one fan module or one power supply module during operations so long as the other modules are installed and operating If you have only one power supply installed you can install the replacement...

Страница 15: ...High humidity can cause moisture to enter the switch Moisture can cause corrosion of internal components and degradation of properties such as electrical resistance thermal conductivity physical strength and size The switch is rated to withstand from 5 to 95 percent noncondensing relative humidity Buildings in which the climate is controlled by air conditioning in the warmer months and by heat dur...

Страница 16: ...ny EMI with a frequency above 10 kHz This type of interference can travel from the switch to other devices through the power cable and power source or through the air as transmitted radio waves The Federal Communications Commission FCC publishes specific regulations to limit the amount of EMI and RFI that are emitted by computing equipment Each switch meets these FCC regulations To reduce the poss...

Страница 17: ...properly install the chassis in a grounded rack the switch is grounded because it has a metal to metal connection to the rack Alternatively you can ground the chassis by using a customer supplied grounding cable that meets your local and national installation requirements For U S installations we recommend 6 AWG wire Connect your grounding cable to the chassis with a grounding lug provided in the ...

Страница 18: ... circuit that is used by the switch is dedicated to the switch For AC input application please refer to the following statement Note Statement 1005 Circuit Breaker This product relies on the building s installation for short circuit overcurrent protection Ensure that the protective devices are rated not greater than 20A North America 16A Europe and 13A UK Warning For DC input application please re...

Страница 19: ... a cold aisle The fan and power supply modules must have the same direction of airflow even if their coloring is different If you must change the airflow direction for the switch you must shutdown the switch before changing the modules Note Rack and Cabinet Requirements You can install the following types of racks or cabinets for your switch Standard perforated cabinets Solid walled cabinets with ...

Страница 20: ...u slide the unit out for servicing Failure to stabilize the rack can cause the rack to tip over Warning Clearance Requirements Provide the chassis with adequate clearance between the chassis and any other rack device or structure so that you can properly install the chassis Provide the chassis with adequate clearance to route cables provide airflow and maintain the switch For the clearances requir...

Страница 21: ...tion see the following figure Chassis width 3 Chassis 1 Service clearance that is required for replacing the chassis equals the length of the chassis 4 Vertical rack mount posts and rails 2 Both the front and rear of the chassis must be open to both aisles for airflow Note Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 11 Preparing the Site Clearance Requirements ...

Страница 22: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...

Страница 23: ...nections or the fan and power supply modules You can install the switch using the following rack mount options Rack mount kit NXK ACC RMK 2RU which you can order from Cisco This option offers you easy installation greater stability increased weight capacity added accessibility and improved removability with front and rear removal Rack mount kit N9K C9300 RMK which you can order from Cisco You can ...

Страница 24: ...nnecting units to the supply circuit so that wiring is not overloaded Warning If you are not using power redundancy or are using n 1 redundancy you need only one power source If you are using n n redundancy you need two power sources Note Unpacking and Inspecting a New Switch Before you install a new chassis you need to unpack and inspect it to be sure that you have all the items that you ordered ...

Страница 25: ... intake airflow with burgundy coloring N9K C9300 FAN2 Switch accessory kit Rack mount kit Step 2 Check the contents of the box for damage Step 3 If you notice any discrepancies or damage send the following information to your customer service representative by email Invoice number of the shipper see the packing slip Model and serial number of the missing or damaged unit Description of the problem ...

Страница 26: ...ured to the data center floor You must attach mounting brackets to the chassis before mounting the chassis Attaching Center Mount Brackets to the Chassis You need to attach a right angled bracket to each side of the chassis This bracket centers the chassis and secures it in place on a two post rack Statement 1006 Chassis Warning for Rack Mounting and Servicing To prevent bodily injury when mountin...

Страница 27: ...p 2 Use four M4 x 8 mm screws to attach the bracket to the chassis Tighten each screw to 11 to 15 in lb 1 2 to 1 7 N m Step 3 Repeat Steps 1 and 2 to attach the second center mount bracket to the other side of the chassis What to do next You are ready to mount the chassis to the two post rack Installing the Chassis in a Two Post Rack You need to position the chassis near the top of the rack with t...

Страница 28: ...e chassis Statement 1006 Chassis Warning for Rack Mounting and Servicing To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided to ensure your safety This unit should be mounted at the bottom of the rack if it is the only unit in the rack When mounting this unit in a pa...

Страница 29: ...sing the NXK ACC RMK 2RU Rack mount Kit To install the switch you must attach mounting brackets to the rack install slider rails on the rear of the rack slide the switch onto the slider rails install the retainer brackets and secure the switch to the rack with the retainer clips Typically the front of the rack is the side easiest to access for maintenance You must supply the eight 10 32 or 12 24 s...

Страница 30: ...rection for the switch Note b Position a front mount bracket so that it aligns to the desired position in the rack and secure the bracket with 12 24 screws or 10 32 screws depending on the rack thread type see the following figure Tighten 12 24 screws to 30 in lb 3 39 N m of torque and tighten 10 32 screws to 20 in lb 2 26 N m of torque c Repeat Step 1 for the other front rack mount bracket on the...

Страница 31: ...read type see the following figure Tighten 12 24 screws to 30 in lb 3 39 N m of torque and tighten 10 32 screws to 20 in lb 2 26 N m of torque c Repeat Step 3 to attach the other slider rail to the other side of the rack To make sure that the slider rails are at the same level you should use a level tool tape measure or carefully count the screw holes in the vertical mounting rails Step 4 Insert t...

Страница 32: ...n lb 3 39 N m Step 6 Insert the retainer clip to hold the chassis in place a Align the retainer clip to the inside of the back of the slider rail Make sure to hook the flange to the cutout on the bracket and align the screw holes see the following figure b Attach the screws to secure the retainer clip see the following figure c Repeat Step 6 to attach the other retainer clip on the other side of t...

Страница 33: ...ack is not grounded by attaching a customer supplied grounding cable Attach the cable to the chassis grounding pad and the facility ground Statement 1024 Ground Conductor This equipment must be grounded Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor Contact the appropriate electrical inspection authority or an electrician if you a...

Страница 34: ...the grounding lug by attempting to pull the wire out of the crimped lug 2 M4 screws are used to secure the grounding lug to the chassis 3 Chassis grounding pad 1 Grounding cable with 0 75 in 19 mm of insulation that is stripped from one end which is inserted into the grounding lug and crimped in place 2 Step 3 Secure the grounding lug to the chassis grounding pad with two M4 screws see the previou...

Страница 35: ...ed amperage located within reach of the power cable being used Connect each power supply to a power source as follows Connecting an AC power supply 1 Using the recommended power cable for your country or region see Power Cable Specifications on page 51 connect the C13 plug on the power cable to the power receptacle on the power supply 2 Rotate the cable retention clip on the power supply over the ...

Страница 36: ...wdriver to depress the spring loaded wire retainer lever on the middle spring cage wire connector Insert your black DC negative wire into the aperture and then release the lever 7 Use a small screwdriver to depress the spring loaded wire retainer lever on the upper spring cage wire connector Insert your red DC positive wire into the aperture and then release the lever 8 Insert the connector block ...

Страница 37: ... components Application Centric Infrastructure Controller APIC appliance cluster of APICs Leaf switches for switch compatibility please see the data sheets here https www cisco com c en us products switches nexus 9000 series switches datasheet listing html Spine switches for switch compatibility please see the data sheets here https www cisco com c en us products switches nexus 9000 series switche...

Страница 38: ...u shield any potential noise sources by housing them in a grounded metallic conduit Note The optical transceivers that are not already assembled to their cables come separate from their cables To prevent these transceivers and their cables from being damaged we recommend that you keep the transceivers disconnected from their cables when installing them in ports and then insert the optical cable in...

Страница 39: ...Infrastructure Controller APIC in your ACI fabric The type of virtual interface card VIC installed on the APIC determines the types of interface cables that you can use to connect the leaf switches to the APICs The VIC 1225T module supports copper connectors copper cables and switches with copper downlink ports such as Cisco Nexus 93108TC EX 93108TC FX 93120TX 93128TX 9372TX 9372TX E and 9396TX sw...

Страница 40: ...rt on a leaf switch before connecting the cable to the transceiver For Cisco SFP Active Optical Cables insert the transceiver on the cable into a downlink optical port on a leaf switch For a 10GBASE T copper cable insert the RJ 45 connector on the cable into a downlink BASE T port on a leaf switch To determine which transceivers and cables are supported by this switch see http www cisco com c en u...

Страница 41: ...de Note Multiple uplinks from a leaf switch to a spine switch is supported A symmetrical topology is recommended so that all devices have equal access to resources Note Step 1 For the transceivers with removable cables make sure that the transceivers are separated from their interface cables Step 2 Insert the appropriate transceiver into an active uplink port on the leaf switch Step 3 Insert the s...

Страница 42: ...ish This action prompts all traffic to use the other first generation switch for data traffic Disconnect the cabling from vPC secondary Step 2 Uninstall the first generation switch by reversing the order of the steps in the Installing the Switch Chassis section of the switch specific Hardware Installation Guide Step 3 Install the second generation switch by following the steps in the Installing th...

Страница 43: ... switch or after completing the boot process for the switch Before you begin The console device must support VT100 terminal emulations and asynchronous transmissions Step 1 Configure the terminal emulator program to match each of the following default port characteristics 9600 baud 8 data bits 1 stop bit No parity Step 2 Insert the RJ 45 connector on the interface cable found in the accessory kit ...

Страница 44: ...s Do not remove and insert a transceiver more often than is necessary Repeated removals and insertions can shorten its useful life Keep all optical connections covered when not in use Clean them before using to prevent dust from scratching the fiber optic cable ends Do not touch the ends of connectors Touching the ends can leave fingerprints and cause other contamination Clean the connectors regul...

Страница 45: ...side of the module Also to prevent any damage to the electrical connectors prevent them touching anything that can bend or break them Caution Step 6 Place the module on an antistatic surface or inside an antistatic bag If possible repack the module in its shipping materials for safe shipping or storage Step 7 Remove the replacement module from its packing materials and place it on an antistatic su...

Страница 46: ...e power supplies must have blue or gray coloring for the same airflow direction If the fan module has a burgundy stripe for port side intake airflow the power supplies must have burgundy or green coloring for the same airflow direction To avoid over heating the switch make sure that the fan modules are positioned in one of the following ways For port side exhaust airflow with blue coloring positio...

Страница 47: ...otect the electrical connectors avoid letting them come in contact with anything other than the electrical connectors inside the chassis b Verify that you have the right fan module for the chassis The correct fan module has one of the following part numbers N9K C9300 FAN2 B port side exhaust airflow direction and a blue stripe N9K C9300 FAN2 port side intake airflow direction and a burgundy stripe...

Страница 48: ... other installed power supply Additionally the airflow direction of the power supply must match the airflow direction of the installed fan modules For the airflow direction used by the switch see the coloring of the fan modules The following list describes the power supplies supported by this switch N9K PAC 650W B 650 W port side exhaust blue latch power supply requiring an AC power source N9K PAC...

Страница 49: ... you must shut off the power from the power source and then either disconnect a connector for the power cables or release each of three cables from the power supply requires a standard screw driver Step 1 Turn off the circuit breaker for the power feed to the power supply that you are replacing Be sure that the LEDs turn off on the power supply that you are removing Step 2 Remove the power cable f...

Страница 50: ...the module and the other hand holding the handle turn the power supply so that its release latch is on the right side and align the back end of the power supply the end with the electrical connections to the open power supply slot before carefully sliding the power supply all the way into the slot until it clicks into place If the power supply does not fit into the open slot turn the module over b...

Страница 51: ...lly sliding the power supply all the way into the slot until it clicks into place If the power supply does not fit into the open slot turn the module over before carefully sliding it into the open slot Note Step 2 If the DC power cables and a grounding cable are already connected to an electrical connector block insert the block into the power receptacle on the power supply If the electrical cable...

Страница 52: ... connector as shown in the following figure with the orange plastic button on top 48V DC cable 4 Wire retainer lever 1 Grounding cable 8 AWG recommended 5 Orange plastic button on top of the connector 2 48V Return DC cable 3 Step 5 Use a small screwdriver to depress the spring loaded wire retainer lever on the lower spring cage wire connector Insert your green ground wire into the aperture and the...

Страница 53: ...f the cables are attached to the DC power source and ground You are then ready to turn on the DC power source Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 43 Replacing Modules Wiring a 48 V DC Electrical Connector Block ...

Страница 54: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 44 Replacing Modules Wiring a 48 V DC Electrical Connector Block ...

Страница 55: ...n racks If you are selecting an enclosed cabinet we recommend one of the thermally validated types either standard perforated or solid walled with a fan tray Note We do not recommend that you use racks that have obstructions such as power strips because the obstructions could impair access to field replaceable units FRUs Note General Requirements for Cabinets and Racks The cabinet or rack must als...

Страница 56: ...mounting the chassis in an open rack no side panels or doors ensure that the rack meets the following requirements The minimum vertical rack space per chassis must be two rack units RUs equal to 3 5 inches 8 8 cm The distance between the chassis air vents and any walls should be 2 5 inches 6 4 cm Requirements Specific to Perforated Cabinets A perforated cabinet has perforations in its front and re...

Страница 57: ... page 51 Regulatory Standards Compliance Specifications on page 52 Environmental Specifications Specification Environment 32 to 104 F 0 to 40 C Ambient operating temperature Temperature 40 to 158 F 40 to 70 C Ambient nonoperating 5 to 85 Nonoperating Relative humidity 0 to 13 123 feet 0 to 4 000 meters Operating Altitude Switch Dimensions Height Depth Width Switch 3 5 inches 8 9 cm 2 RU 22 5 inche...

Страница 58: ...ations and 1 for redundancy 2 42 lb 1 1 kg 2 42 lb 1 1 kg 2 42 lb 1 1 kg 2 42 lb 1 1 kg Power Supply module 650 W AC port side exhaust blue N9K PAC 650W B 650 W AC port side intake burgundy N9K PAC 650W 930 W DC port side exhaust gray UCS PSU 6332 DC 930 W DC port side intake green UCSC PSU 930WDC Transceiver and Cable Specifications To determine which transceivers adapters and cables are supporte...

Страница 59: ... Cisco Nexus 9396PX Power Specifications Power specifications include the specifications for each type of power supply module 650 W AC Power Supply Specifications These specifications apply to the following power supplies N9K PAC 650W N9K PAC 650W B Specification Characteristic Nominal range 100 and 240 VAC Range 90 132 VAC 180 264 VAC AC input voltage Nominal range 50 to 60 Hz Range 47 63 Hz AC i...

Страница 60: ...ent 8 ms at 930 W Maximum hold up time 12 VDC Power supply output voltage 12 VDC Power supply standby voltage Greater than 92 at 50 load Efficiency rating RSP1 Form factor 930 W DC Power Supply Port Side Exhaust Specifications These specifications apply to the 930 W DC UCS PSU 6332 DC power supplies Specification Characteristic 23 A at 48 VDC Maximum DC input current 1104 W Maximum input W 930 W M...

Страница 61: ...et 2 5 m CAB 250V 10A AR Argentina 250 VAC 10 A 3112 plug 8 2 feet 2 5 m CAB 9K10A AU Australia 250 V 10 A 6 9 feet 2 1 m CAB 250V 10A BR Brazil 250 VAC 10 A CEE 7 7 plug 8 2 feet 2 5 m CAB 9K10A EU European Union 10 A 8 2 feet 2 5 m CAB IND 10A India 250 V 10 A 8 2 feet 2 5 m CAB 250V 10A IS Israel 250 VAC 10 A CEI 23 16 VII plug 8 2 feet 2 5 m CAB 9K10A IT Italy 125 VAC 13 A NEMA 5 15 plug 8 2 f...

Страница 62: ...urce connection CAB 48DC 40A 8AWG UCS PSU 6332 DC port side exhaust airflow No power cord included with switch NO POWER CORD All except Argentina Brazil and Japan Regulatory Standards Compliance Specifications The following table lists the regulatory standards compliance for the switch Table 1 Regulatory Standards Compliance Safety and EMC Description Specification Products should comply with CE M...

Страница 63: ...0 3 2 EN61000 3 3 KN22 Class A CNS13438 Class A EMC Emissions EN55024 CISPR24 EN300386 KN 61000 4 series EMC Immunity The product is RoH 6 compliant with exceptions for leaded ball grid array BGA balls and lead press fit connectors RoHS Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 53 System Specifications System Specifications ...

Страница 64: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 54 System Specifications System Specifications ...

Страница 65: ...The operator has activated this LED to identify this switch in the chassis Flashing blue BCN This switch is not being identified Off The switch is operational Green STS The switch is booting up Flashing amber Temperature exceeds the minor alarm threshold Amber Temperature exceeds the minor alarm threshold Red The switch is not receiving power Off Fans and power supply modules are operational Green...

Страница 66: ...their port as being the top or bottom port Status Color LED This module is operational Green STS Temperature is not operational Red The module is not receiving power Off The two ports above this LED are enabled On white ACT The two ports above this LED are not enabled Off The port is connected with a transceiver or other connector Green port The port is not connected Off Fan Module LEDs The fan mo...

Страница 67: ...reen Power supply is connected to a power source but not outputting power to the switch power supply might not be installed in the chassis Off Flashing green Power supply is not receiving power Off Off Power supply warning possibly one of the following conditions High voltage High power Low voltage Power supply installed in chassis but not connected to a power source Slow power supply fan Flashing...

Страница 68: ...Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 58 LEDs Power Supply LEDs ...

Страница 69: ...t Rack mount brackets 2 Rack mount retainer brackets 2 Rack mount slider rails 2 Rack mount retainer clips 2 Phillips countersink screws 8 Flat head screws 4 1 Ground lug kit Two hole lug 1 M4 x 8 mm Phillips pan head screws 2 1 EAC Compliance document Not applicable 1 Hazardous substances list for customers in China Not applicable The following table lists and illustrates the console cable CAB CO...

Страница 70: ... RMK The following table lists and illustrates the contents for the 2 RU rack mount kit N9K C9300 RMK Quantity Description Illustration 1 Rack mount kit Bottom support rails 2 Front mount brackets 2 Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 60 Additional Kits Rack Mount Kit N9K C9300 RMK ...

Страница 71: ...on and accessibility The following table lists the site planning tasks that we recommend that you complete before you install the switch Your completion of each task ensures a successful switch installation Verification Time and Date Planning Activity Space evaluation Space and layout Floor covering Impact and vibration Lighting Physical access Maintenance access Environmental evaluation Ambient t...

Страница 72: ...enter ground Cable and interface equipment evaluation Cable type Connector type Cable distance limitations Interface equipment transceivers EMI evaluation Distance limitations for signaling Site wiring RFI levels Contact and Site Information Use the following worksheet to record contact and site information for the installation Contact person Contact phone Cisco Nexus 9396PX ACI Mode Switch Hardwa...

Страница 73: ...l number Product number Use the following worksheet to record network related information Switch IP address Switch IP netmask Hostname Domain name IP broadcast address Gateway router address DNS address Use the following worksheet to record information about the modules in the switch Notes Module Serial Number Module Type Module Slot Uplink module Cisco Nexus 9396PX ACI Mode Switch Hardware Instal...

Страница 74: ... Type Module Slot Fan module 1 Fan module 2 Fan module 3 Power Supply 1 Power Supply 2 Cisco Nexus 9396PX ACI Mode Switch Hardware Installation Guide 64 Site Preparation and Maintenance Records Site Preparation and Maintenance Records ...