2-6
Cisco NAC Appliance Hardware Installation Guide
OL-20326-01
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
•
Always disconnect all external cables before lifting or moving the appliance.
•
Ensure that your footing is solid, and balance the weight of the object between your feet.
•
Lift the appliance slowly; never move suddenly or twist your body as you lift.
•
Keep your back straight and lift with your legs, not your back. If you must bend down to lift the
appliance, bend at the knees, not at the waist, to reduce the strain on your lower back muscles.
•
Lift the appliance from the bottom; grasp the underside of the appliance exterior with both hands.
Preparing Your Site for Installation
Before installing a Cisco NAC Appliance CAM/CAS, it is important to prepare the following:
1.
Prepare the site (see
Site Planning, page 2-6
) and review the installation plans or method of
procedures (MOPs).
2.
Unpack and inspect the appliance.
3.
Gather the tools and test equipment required to properly install the appliance.
This section contains:
•
Site Planning, page 2-6
•
Shipping Package Contents, page 2-10
•
Failover Bundles, page 2-11
•
Required Equipment, page 2-11
•
Configuration Worksheets, page 2-11
Site Planning
Warning
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
Typically, you should have prepared the installation site beforehand. As part of your preparation, obtain
a floor plan of the site and the equipment rack where the Cisco NAC Appliance CAM/CAS will be
housed. Determine the location of any existing appliances and their interconnections, including
communications and power. Following the airflow guidelines (see
Airflow Guidelines, page 2-9
)
ensures that adequate cooling air is provided to the appliance.
All personnel involved in the installation of the appliance, including installers, engineers, and
supervisors, should participate in the preparation of a MOP for approval by the customer. For more
information, see
Method of Procedure, page 2-10
.
The following sections provide the site requirement guidelines that you must consider before installing
the appliance:
•
Rack Installation Safety Guidelines, page 2-7
•
Site Environment, page 2-8
•
Airflow Guidelines, page 2-9
•
Temperature and Humidity Guidelines, page 2-9
Содержание NAC-3310
Страница 8: ...Contents 6 Cisco NAC Appliance Hardware Installation Guide OL 20326 01 ...
Страница 172: ...A 4 Cisco NAC Appliance Hardware Installation Guide OL 20326 01 Appendix A Open Source License Acknowledgements Notices ...
Страница 176: ...Index IN 4 Cisco NAC Appliance Hardware Installation Guide OL 20326 01 ...