SERVICE MANUAL
–
Post eVolve Smart
13 - MAINTENANCE
CIRCONTROL, S.A.
–
Innovació, 3
–
08232
–
Viladecavalls (Barcelona)
Tel.: +34 937 362 940
–
Fax: +34 937 362 941
89
Web: www.circontrol.com
–
E-mail:
Verification of Installation Electrical
components
Description
Status
26
Verification of the external wires according to the product specifications
OK
NOK
27
Verification of the MCB and RCD protections according to the product specifications (AC Circuit)
OK
NOK
Neutra
l
28
Input Voltage check in Phase 1
OK
NOK
Input Voltage check in Phase 2
OK
NOK
Input Voltage check in Phase 3
OK
NOK
Input Voltage check between Neutral and Ground
OK
NOK
Comments
Verification of the internal electrical
components
Nº
Description
Status
29
Verification of the internal wires and tightening of the terminals
OK
NOK
30
Isolation Test and earth leakage
OK
NOK
31
Secondary MCB's and RCD's protection test
OK
NOK
32
Verification of the output voltage in the MCB's
OK
NOK
33
Power Supply Devices 12Vdc / 24Vdc
OK
NOK
34
Multiconnectors of 12Vdc / 24Vdc / 230V / Ground
OK
NOK
35
Boards Connectors
OK
NOK
36
Heater
OK
NOK
37
Tamper System
OK
NOK
38
Contactors Status
OK
NOK
39
Relays Status
OK
NOK
Comments