
Chapter 3 Inverter Installation and Wiring
Chapter 3 Inverter Installation and Wiring
3.2.2 Installation of the remote-controlled operator panel and connecting wire
1
Installation of the operator panel and connecting wire of the inverter Model A
Step 1. Button up with a hand at the notch of the upper part of operator panel and remove the
operator panel (as shown in the figure 3-8).
Fig. 3-8 Mounting Demonstration of the operator panel
and connecting wire of the inverter Model A
Step 2. Fix the jack panel provided in the optional components in the installation position of
operator panel (as shown in the figure 3-9).
Fig. 3-9 Mounting Demonstration of the operator panel
and connecting wire of the inverter Model A
Step 3. Plug the ground end of connecting wire provided in the optional components
into the slot of jack panel (as shown in the figure 3-10).
Fig. 3-10 Mounting Diagram for the operator panel and
connecting wire of the inverter Model A
Step 4. Put the dismantled operator panel into the installation frame provided in the
optional components, fix and fasten it. Plug the other end of connecting wire into the
jack panel slot, then plug the slot into the operator panel (as shown in the figure 3-11).
Fig. 3-11 Mounting Diagram for the operator panel
and connecting wire of the inverter Model A
Содержание ZVF9V-G/P
Страница 8: ...M Integration Module S Schism Module...
Страница 12: ......
Страница 16: ......
Страница 21: ...Inverter...
Страница 33: ......
Страница 87: ......