www.chinowing.com
60
12. V40 Video Link Module Operation and Use
12.1 V40 Connection Instruction
Switch on the remote control, power on the V40 receiver. After the successful
connection of 2 modules (the V40 LINK light is always on and the T40 S1-S3
signal indicators are constantly ON, this process takes about 1 minute), the self-
test is completed when the work light is always on and the device can be used
normally.
The V40 video link has been set at the factory, and by default the ground unit and
the airborne unit can be communicated directly. If you would like to change the
serial port baud rate and the LAN Port IP address of data link, please refer to the
corresponding sections.
Video Link&Serial Port IP address:
Name
IP Address
Video link Ground IP
192.168.168.1
Video link Airborne IP
192.168.168.2
Serial Port Airborne IP
192.168.168.19
All of the above IP addresses can be accessed in the PC's browser and able to do
the parameters configuration.
In order to prevent users from having problems such as not being able to search,
not being able to ping, and not being able to open web pages in the application.
After the successful connection of the hardware, pls do the following:
① Turn off your computer's firewall and antivirus software (usually in the
control panel).