Configuring Check Point IPSO with IP690 ADP Interfaces
Check Point IP690 Security Platform Installation Guide
71
Note
It is best to perform the procedures in this section on the VRRP backup system first. When
the installation is complete, the upgraded system can become the new master while you
upgrade the original master.
Reconfiguring Interfaces
After you install the ADP module, you need to reconfigure interface information as described
below.
To reconfigure interfaces for ADP modules
1.
Log into the appliance using Check Point Network Voyager.
2.
Navigate to the Interface Configuration page.
Notice that the names of the interfaces in slot 1 have not changed. Any configuration
information for these interfaces is unchanged as well.
The interfaces in slot 2 have been replaced by the ADP interfaces named eth-s1p5 through
eth-s1p8.
Содержание IP690 - Flash Based Sys
Страница 1: ...Part No N450000890 Rev 001 Published March 2009 Check Point IP690 Security Platform Installation Guide...
Страница 6: ...6 Check Point IP690 Security Platform Installation Guide...
Страница 8: ...8 Check Point IP690 Security Platform Installation Guide...
Страница 10: ...10 Check Point IP690 Security Platform Installation Guide...
Страница 26: ...1 Overview 26 Check Point IP690 Security Platform Installation Guide...
Страница 32: ...2 Installing the Check Point IP690 Appliance 32 Check Point IP690 Security Platform Installation Guide...
Страница 56: ...5 Connecting PMC Network Interface Cards 56 Check Point IP690 Security Platform Installation Guide...
Страница 76: ...6 Installing Using and Replacing ADP Services Modules 76 Check Point IP690 Security Platform Installation Guide...
Страница 110: ...A Technical Specifications 110 Check Point IP690 Security Platform Installation Guide...
Страница 118: ...Index 118 Check Point IP690 Security Platform Installation Guide...