page 5
www.centsys.com
14.
RHS Flush Mount - Opposing Direction of Travel
14.1. Con
fi
guring the Drive Linkage Assembly
14.2. Spike Module Assembly
14.3. Preparing the Trench and Drainage System
14.4. Re-assembling the Ramp Plates and Linkage Cover
14.5. Integrating the SECTOR II with the
CLAWS
14.6 Completing the Assembly
15.
LHS Flush Mount - Similar Direction of Travel
15.1. Con
fi
guring the Drive Linkage Assembly
15.2. Spike Module Assembly
15.3. Preparing the Trench and Drainage System
15.4. Re-assembling the Ramp Plates and Linkage Cover
15.5. Integrating the SECTOR II with the
CLAWS
15.6 Completing the Assembly
16.
LHS Flush Mount - Similar Direction of Travel
16.1. Con
fi
guring the Drive Linkage Assembly
16.2. Spike Module Assembly
16.3. Preparing the Trench and Drainage System
16.4. Re-assembling the Ramp Plates and Linkage Cover
16.5. Integrating the SECTOR II with the
CLAWS
16.6 Completing the Assembly
17. Wiring
Diagram
18. Installation
Handover
Icons used in this manual
This icon indicates tips and other
information that could be useful
during the installation.
This icon denotes variations
and other aspects that should be
considered during installation.
This icon indicates warning,
caution or attention! Please
take special note of critical
aspects that MUST be adhered
to in order to prevent injury.
This icon indicates areas
where mechanical crushing
may occur
CONTENTS
page 111
page 111
page 114
page 121
page 123
page 124
page 128
page 129
page 129
page 132
page 139
page 141
page 142
page 146
page 147
page 147
page 150
page 157
page 159
page 160
page 164
page 165
page 166
CONTENTS
Содержание CLAWS
Страница 1: ...CLAWS DIRECT DRIVE INSTALLATION MANUAL TRAFFIC BARRIERS Centurion Systems Pty Ltd www centsys com...
Страница 51: ...page 51 www centsys com Notes...
Страница 69: ...page 69 www centsys com Notes...
Страница 87: ...page 87 www centsys com Notes...