page 144
www.centsys.com
LHS FLUSH MOUNT - SIMILAR DIRECTION OF TRAVEL
SECTION 15
15.5.2. Fitting and leveling the SECTOR II boom pole
Refer to Section 3.3 of the SECTOR II Installation manual for instructions on
fi
tting and
leveling to boom pole.
Do not place any body parts near the spikes as serious injury could
occur; use the drive arm to move the spikes up and down.
Apply Lock-tite 243 to all the internal threads and torque both the M16x40 and
M16x110 bolts to 40Nm (Steps 3 and 4)
15.5.3. Inserting the Con-rod
SECTOR II
Con-rod
FIGURE 54
FIGURE 55
STEP 1
STEP 2
Con-rod
top
M16x110 bolt
68mm Spacer
Output shaft
plate
Drive arm
Con-rod
base
M16x40
bolt
FIGURE 56
FIGURE 57
STEP 3
STEP 4
Содержание CLAWS
Страница 1: ...CLAWS DIRECT DRIVE INSTALLATION MANUAL TRAFFIC BARRIERS Centurion Systems Pty Ltd www centsys com...
Страница 51: ...page 51 www centsys com Notes...
Страница 69: ...page 69 www centsys com Notes...
Страница 87: ...page 87 www centsys com Notes...