14.3. Preparing the Trench and Drainage System
Drainage pipes must be laid at one or both ends of the trench to allow water
to
fl
ow either into storm water drains or into any other area away from
the installation. Section 14, Figure 43 shows two recommended drainage
con
fi
gurations. Once complete, hold the drainage pipes in place by pouring a
100mm concrete foundation and level o
ff
.
If the SECTOR II and
CLAWS
are to be separated, a trench for the conduit and
cables will need to be dug, and the wiring harnesses will need to be extended in
relation to the distance between the gearbox and SECTOR II. This must be done
before any concrete is poured (Section 14.5.2.).
Ensure that the drain pipes will not interfere with the structure when it is in the
trench.
FIGURE 42
FIGURE 43
STEP 1
STEP 2
Trench
Trench
100mm Concrete
foundation
Ground Level
Ground Level
Drainage pipes
Drainage pipes
100mm Concrete
foundation
400mm
400mm
X
400mm
400mm
245mm
735mm
143mm
400mm
Dig a hole following the dimensions below.
The Value of ‘X’ in a:
3m Con
fi
guration
: 3 420mm
4.5m Con
fi
guration
: 4 920mm
6m Con
fi
guration
: 6 420mm
485mm
385mm
RHS FLUSH MOUNT - OPPOSING DIRECTION OF TRAVEL
SECTION 14
Содержание CLAWS
Страница 1: ...CLAWS DIRECT DRIVE INSTALLATION MANUAL TRAFFIC BARRIERS Centurion Systems Pty Ltd www centsys com...
Страница 51: ...page 51 www centsys com Notes...
Страница 69: ...page 69 www centsys com Notes...
Страница 87: ...page 87 www centsys com Notes...