page 24
www.centsys.com
FIGURE 39
STEP 1
6.2.5. Proximity sensor installation
Far end
of the
assembly
Drive linkage
end of the
assembly
20mm PVC
Conduit
The length of the PVC conduit will be relative to the length of the spike modules
and drive linkage unit combined. Ensure that a further 110mm is added to this
to account for the modules and coupling (Refer to Section 6, Figure 40).
FIGURE 40
19mm
91mm
Sandwich plate
20mm
PVC
conduit
20mm
PVC
conduit
RHS SURFACE MOUNT - SIMILAR DIRECTION OF TRAVEL
SECTION 6
Содержание CLAWS
Страница 1: ...CLAWS DIRECT DRIVE INSTALLATION MANUAL TRAFFIC BARRIERS Centurion Systems Pty Ltd www centsys com...
Страница 51: ...page 51 www centsys com Notes...
Страница 69: ...page 69 www centsys com Notes...
Страница 87: ...page 87 www centsys com Notes...