© Toshiba International Corporation 2021 www.toshiba.com/tic Email: [email protected] (855) 803-7089 13131 West Little York Road, Houston, TX
Estimated Time: 20-30 Minutes
Level: 1
Prerequisite:
•
S15 Application Note 1.1.0
Navigating Menus & Parameters
S15 Application Note 1.8.0
Startup Guide
Setup and program the basic parameters.
Visual Inspection
□
No foreign materials (metal shavings, hardware)
Input and Output Wiring
□
Input leads are not wired to output terminals
□
Input, output and control wires are in separate conduit
□
Motor leads do not share conduit with any other motor leads
□
Verify input and output wire tightness and condition (continuity, frayed wires, loose connections,
pinched insulation)
Motor Terminal Box
□
Verify no power factor correction capacitors are installed
□
Verify wire tightness and condition (continuity, frayed wires, loose connections, pinched insulation)
Drive to Motor Ground Connection
(ASD chassis to motor chassis)
□
Verify wire tightness and condition (continuity, frayed wires, loose connections, pinched insulation)
Record the Electrical Distribution System
Grounding Capacitor
□
Enabled
□
Disabled
This should be
DISABLED
on Ungrounded, Corner Grounded or High Impedance Grounding Systems
otherwise it could result in a VFD failure. Refer to Section 1.3.3 of the S15 Instruction Manual E6582175
for more details.
STEP
A
Startup Checklist
Delta/Wye with Grounded Secondary