Boiler must not be used in flammable and explosive environment. It must not be 
used by children or disabled persons (either physically or mentally), as well as by 
person without knowledge or experience, unless they are under control or trained 
by s person responsible for their safety. Children must be supervised in the vicinity 
of the product. Protective gloves must be used (Image 9). 
Fuel with max. 25% moisture content may be used.
Before starting up it is necessary to check following:
- if the fresh air access to the boiler room is available (Point 4.0).
- if the boiler and the whole system are properly filled with water and airvented.

- if the safety elements are properly connected and are functioning perfectly:

- closed central heating systems should have safety valve of max. 2,5 bar, thermal
  safety valve and expansion vessel of min. volume which is not less then 10% of the
  total water quantity in the system.
- open central heating systems should have an open expansion vessel of min.
  volume which is not less then 7% of the total water quantity in the system situated
  enough over the level of the highest radiator in the system and insulated, if it is
  mounted outside of heated space.

- if the mobile elements of the boiler are properly positioned:

- sheet metal protecting cover (

ZL-page 3

) have to be fixed to the carriers in the 

  upper combustion chamber.
- pieces of the lower refractory stone have to be situated into the deposits on the 
  lower wall of the combustion chamber (

DS-page 3

).

- turbulators (

TU-page 28

) have to be fixed inside the flue exhaust tubes 

  (

DC-page 3

).

- air damper (

PZ-page 3

) for secondary and primary air.

- if movable elements-two lids of bottom openings of the flue gas chamber and flue
  gas tube cleaning lever.
Firing has to be performed according to the instructions described in this manual 
(See points 6.0 to 6.4) and Technical manual ‘’Digital boiler regulation Bio-Tec’’.
If you are sure that energy from boiler will be consumed, made firing up for one filling 
of the upper combustion chamber.

IGNITION PHASE AND FIRST FUEL CHARGING:

- Open upper boiler doors (and close bottom if they open) (see Image 7)
- Put fine chopped wood to the upper chamber, on refractory stone (chamotte) over

  the burner nozzle so that the nozzle is not obstructed, then put crumpled paper

  for ignition and fill the top chamber with fuel (split logs). (see Image 7, Image 8).

10

15

20

25

30

35

40

45

50

60

70

80

90

100

110

5

10

15

18

20

22

25

30

35

6 7 8 9

An example of the chimney selection:

boiler output:

Fuel: wood
required useable chimney height
required inner chimney diameter

boiler output:

Fuel: wood
required useable chimney height
required inner chimney diameter

boiler output:

Fuel: wood
required useable chimney height
required inner chimney diameter

 25 kW


: H=8 m

: 18 cm

 35 kW


: H=8 m

: 20 cm

 45 kW


: H=8 m

: 22 cm

Bio-Tec 35/45

Bio-Tec 25

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

Connection to the chimney, calibrating of the chimney

Image 4.

 Incorrect connecting the boiler to the chimney

Fan

Flue gas elbow

Flue gas tube

Image 5.

 - 

Calibrating of the chimney for Bio-Tec boilers 

Useable chimney height - 

from flue gas tube connection

                                            to the top of chimney

Inner chimney diameter - 

interior chimney diameter.

Nominal thermal output of the boiler (kW)

Useful height of the chimney (m)

wood fireing

In

n

e

r d

ia

m

e

te

r o

f t

h

e c

h

im

n

e

y (

c

m

)

Boiler use

10.0.   BOILER USE

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: