Centrometal Bio-Tec 25 Скачать руководство пользователя страница 8

8

25

Boiler use

- Close upper boiler doors. (see image 7)

- Turn the MAIN SWITCH on. (see Point 7.0)

- Push the button START (the LED diode flutters). (see Point 7.0)

- Open the middle door and ignite paper (see Image 7)

- Couple minutes after fine chopped wood starts burning, close the middle door.   

   (see Image 7)

- Push the button START (the LED diode lights) (see Point 7.0)

- (Only for Bio-Tec 25) place the button RP (see page 3) into position "   "

- (Only for Bio-Tec 25) leave the button RP (see page 3) in position "   " at least 1

  hour or longest to the next charge with wood and then restore it in the left position.

The above actions are for ignition of the boiler from cold state (without glow).

These measures should be implemented always when we don’t have, or don’t

have enough glow, and when we will load the wood.

After the regulation starts to display the lack of fuel         , the fuel should be

refilled (if it is necessary to continue the heating process)-BEFORE REFILLING,

press START button ones.

FUEL REFILLING PHASE:

- open the upper boiler door (see Image 7)

- align glow with poker

- insert fuel (recommended to fill the full firebox) (see Image 8)

- close the upper boiler door (see Image 7)

-press button START for second time. (see Point 7.0)

NOTE:

- During the process of refilling the fuel the main switch of the boiler has to be

  turned on. When the firing proces is 

over

 we can turn off the main switch, but first

  it is necessary, after the indication ''FUEL''         is turned on, to wait that the boiler

  cool down under 65°C and the glow disappear in combustion chamber (see point

  7.0.).

min.  500  mm

10mm

H

H

H

 - 

Useable chimney height

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

Connection to the chimney, fresh air opening

3.0.  CONNECTION TO THE CHIMNEY

Properly calibrated and built chimney is the precondition for a safe operation of the 
boiler and economic heating. The chimney has to be good insulated, gas-proof and 
smooth. On the lower part of the chimney, a cleaning door has to be built in. Brick 
layed chimney has to have 3 layers with an stone wool thermal insulation in the 
middle. The thickness of the insulation should be 30 mm, if the chimney is situated 
inside the building, i.e. 50 mm if the chimney is situated outside the building. 

Inside 

chimney  diameter  dimensions  depend  on  its  height  and  on  the  boiler 
capacity (Image 5.).

 The temperature of the flue gases on their exit point should be 

minimum 30°C higher then the temperature of their condensating point. The choice 
and the construction of the chimney should be performed by an authorized person. 
Minimal distance between boiler and the chimney is 500 mm. The flue gas tube has 
to  have  an  inclination  of  30-45°  (Image  4.).  In  order  to  unable  entering  of  the 
condensate from the chimney into the boiler, 10 mm of the flue gas tube length has 
to  be  inserted  deaper  inside  the  chimney. 

It  is  recommended  to  insulate  the 

chimney  connection  tube  with  a  mineral  wool

  of  30-50  mm  thickness.  All 

installation works must be made in accordance with valid national and European 
standards. 

At connecting a boiler to the chimney, flue

 gas tubes

 and elbows must 

not pass behind the fan since in that case the cleaning and maintenance will not be 
possible. An example of

 incorrect

 position of 

flue gas tubes

 and elbows in relation to 

the fan is presented at the 

Image

 3.

Image 3. 

-

 

Possible connecting of the Bio-Tec boiler to the chimney

Opening for the cleaning

Thermal insulation

Possible way of connecting to the chimney of the 
Bio-Tec boiler (

recommendation

)

Possible way of connecting 
to the chimney of the Bio-Tec boiler 
(

Only Bio-Tec 35/45

)

Opening for the cleaning

Thermal insulation

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: