Centrometal Bio-Tec 25 Скачать руководство пользователя страница 7

7

26

A

Bio-Tec 

35/45

Bio-Tec 25

Covers (DO) of the the lower 
openings the flue gas chaber adjust 
on to foresee place (detail A).

For the proper operation of the 
boiler it is IMPORTANT to hard 
tighten the doors how it to seal 
perfectly !!

DO

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

Installation of moving parts

2.1.  INSTALLATION OF MOVING PARTS

Bio-Tec movable parts are delivered packed as a set within the top boiler chamber. 
After the boiler is placed in the boiler room, installation of movable parts is carried 
out (page 3, DO- two lids of bottom openings of the flue gas chamber and ZP-lever 
for cleaning of flue gas tubes). The lid of bottom openings of the flue gas chamber 
has to be fixed by two screws to the boiler body to achieve good tightness to prevent 
air penetration during boiler operation (see Image 2). The flue gas tube cleaning 
lever can be installed either on the left or on the right boiler side with screws M8 onto 
the prepared holder (page 3).

Image 2.

 

 (DO)

Mounting of lower opening covers for flue gas chamber cleaning

Lateral openings

for cleaning the

flue gas chamber

Detail A:

Cleaning and mainternance of the boiler

11.0.  CLEANING AND MAINTENANCE OF THE BOILER

Protective gloves must be used (see Image 9). Ash remaining in boiler after solid 
fuel firing should be disposed into metal containers with a cover. 

(press button ''START''

As through the 

wood gasification

 principle the fuel burns out totally, the cleaning of the boiler is 

limited to the upper and lower combusting chamber once in a week and the cleaning 
of flue gas tubes (DC - page 3) on the back side of the boiler is necessary only after 
the heating season, i.e. min. once in one heating season. 

Before each starting of the boiler 

) it is reccomended 

to shake the flue gas tube cleaning lever few times (Image 11 - ZP).

Cleaning the 

fan blade

 VP 

and 

fan

 box has to be performed when necessary.

Cleaning of 

lower

 and 

upper

 part of the 

combustion chamber

:

-

 

to be performed by a 

poker

 delivered with the boiler. 

it is necessary to take care, at cleaning the 

lower

 

combustion chamber

, to

 c

lean

  latteral

 sides of the 

lower

 

combustion chamber

 well, in order to provide as better

 

 heat exchange and maximum boiler 

efficiency

, as possible (

Image

 11,

-

BL).

Cleaning of fan blades

 (Image 8.-VP):

- unscrew four M8 nuts by which the fan flange is fixed to the boiler (Image 11).
- pull out the fan (Image 11.-VT) with the flange along the flange holder 

(Image11.-NV) and turn it to the left to access the fan blade (Image 11.-VP).

- then, remove all deposits of ash and impurities from the blade.
- put the fan together with the flange back on four M8 screws and tighten them 

with four M8 nuts to get good air tightness during operation.

Cleaning of the fan box

 (Image 11.-KV):

- unscrew two M8 nuts and remove the fan box lid with gasket (Image 11.-VD).
- remove ash and impurities from the fan box.
- place back the fan box lid (Image 11.-VD) with gasket on two M8 screws and 

tighten them with two M8 nuts to get good air tightness during operation.

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...