Centrometal Bio-Tec 25 Скачать руководство пользователя страница 11

11

22

GV

SV

DV

-
-
-

GV
SV
DV

Open

Close

Left

Right

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

Connection to the open central heating system

Connection to the closed central heating system

5.2.  

CONNECTION TO THE CLOSED CENTRAL HEATING SYSTEM

build  in  certified  safety  valve  with  opening  pressure  of  2,5  bar,  minimum  seat 
diameter of 15 mm, minimum inlet connection of 1/2", minimum exit connection of 
3/4" and a membrane expansion vessel. Safety valve and expansion vessel must 
be built in accordance with professional rules and any valve must not be located 
between safety valve and expansion vessel and boiler. 

The closed heating system 

must have the installed expansion 

vessel

 of larger volume (

vessel

 volume must be 

approx. 10% of the installation volume).

 In all boiler types the heating pump 

must 

be

 connected to boiler regulation so that the heating pump switching on and off 

would  depend  on  water  temperature  in  the  boiler.

In closed heating system (as in example shown in Scheme 2) it is 

obligatory

 to 

 

regulation is shown in Technical manual ''Digital boiler regulation Bio-Tec''.

The  functioning  of  boiler 

- After the regulation starts to display the lack of fuel         , the fuel should be

  refilled (if it is necessary to continue the heating process)-BEFORE REFILLING,

  press START button ones. 

FUEL REFILLING PHASE:

- open the upper boiler door (see Image 7)

- align glow with poker

- insert fuel (recommended to fill the full upper combustion chamber) (see Image 8)

- close the upper boiler door (see Image 7)

-press button START for second time. (see Point 7.0)

NOTE:

- During the process of refilling the fuel the main switch of the boiler has to be

  turned on. When the firing proces is 

over

 we can turn off the main switch, but first

  it is necessary, after the indication ''FUEL''         is turned on, to wait that the boiler

  cool down under 65°C and the glow disappear in combustion chamber (see point

  7.0.).

Boiler start up

Upper boiler door
Middle boiler door
Lower boiler door

Image 7. 

- Door opening method

PROCESS THE OPENING OF
BOILER DOOR:

Upper boiler door

 - allowed to open only in ignition phase, fuel charging phase

  and the phase of cleaning of boiler and boiler parts.
  Of durig the opening door is necessary ajar, that leave them for few second so that
  the fan intake smoke trough bypass, and then fully open.

Middle boiler door

 - allowed to open only in ignition phase and the phase of

  cleaning of boiler and boiler parts.

Lower boiler door

 - allowed to open only in the phase of cleaning of boiler and

  boiler parts.

LEGEND:

1

2

5

3

7

T

T

T

T

10

11

9

8

6

4

Scheme 1.

 - Open central heating system with 1 water accumulator

1   - Boiler  Bio-Tec
2   - "CAS" water accumulator
3   - 3-way thermic valve (m

aintains minimum temperature 

       

of return water into the boiler above 60°C

), VTC 531 

       (m

aintains minimum temperature of return water into 

       

the boiler above 60°C

), LTC 141 (m

aintains minimum 

       

temperature of return water into the boiler above 60°C

       or Laddomat 21 (m

aintains minimum temperature 

       

of return water into the boiler above

 63°C)

4   - Manual 3-way mixing valve 
5   - Room thermostat (included into basic delivery)
6   - Heating circuit
7   - Open expansion vessel OPC (enough above 
       the level of the highest radiator, approx. 7% of the 
       total volume of installation)
8   - Sanitary water accumulator 
       (SKB-Digi/LKB-Digi/TB/STEB)
9   - Pump 1 - boiler pump 
10 - Pump 2 - heating pump 
11 - Pump 3 - hot sanitary water pump 

"

"

above the 
highest heating 
body

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: