Boiler / additional equipment positioning and assembly

2.0.  BOILER / ADDITIONAL EQUIPMENT POSITIONING AND ASSEMBLY

The allocating of the boiler has to be carried out by the authorized person. We 
suggest  the  allocation  on  the  solid  concrete  basis,  which  height  is  between                       
50-100  mm.  The  boiler  room  has  to  be  absolutely  protected  from  freezing  and 
properly ventilated. The boiler has to be set up in order to enable its connecting to 
the chimney (see point 3.) as well as its servising during the functioning process, 
cleaning and maintenance (Image 1). The connection boiler to the central heating 
system  is  obligatory  through  the  one  or  more 

CAS  water  accumulators

depending  of  the  boiler's  power.  It  is  recommended  to  connect 

50  liters  water 

accumulation to each 1 kW boiler power

 (i.e. for the 45 kW boiler minimal water 

accumulation should be 2250 liters). The boiler should not be used without being 
connected to the water accumulation tank. It must be connected to the CAS water 
accumulator exclusively through an 3-way thermic valve ESBE VTC 512 (m

aintains 

minimum  temperature  of  return  water  into  the  boiler  above  60°C

),  VTC  531 

(m

aintains  minimum  temperature  of  return  water  into  the  boiler  above  60°C

), 

LTC141 (keep minimal temerature of return water into the boiler above 60°C) or 
Laddomat 21 (m

aintains minimum temperature of return water into the boiler above

 

63°C).

WARNING!
Flammable items must not be placed on the boiler and within the minimum 
distances shown in Figure 1.

Image 1.

 Minimum distance from the room walls

*

valid for closest tank to the wall

Cleaning and mainternance of the boiler

Cleaning of the flue gas chamber with flue gas tubes

 (Image 11.-DC):

- remove top back cover of the boiler casing (Image 11.-PD).
- unscrew four M8 nuts and remove the lid of top opening for flue gas tube
  cleaning (Image 11.-GO).
- take out the wire fuse (Image 11.-ZO).
- unhook turbulator holder (Image 11.-DT) together with turbulators (Image 11.
  -TU) from the shaft (Image 11.-DN).
- take out the turbulator holder (Image 11.-DT) together with turbulators (Image
  11.-TU) from the flue gas chamber.
- clean flue gas tubes using a brush (Image 11.-CC) supplied with the boiler.
- remove turbulators (Image 11.-TU). from the turbulator holder (Image 11.-DT).
- clean spiral turbulators (Image 11.-TU) and place them back together with the
  turbulator holder (Image 11.-DT) into flue gas tubes.
- hook the turbulator holder (Image 11.-DT) onto the shaft (Image 11.-DN).
- place back the wire fuse (Image 11.-ZO).
- place back the lids of bottom openings for the flue chamber cleaning (Image
  11.-GO) to their original place and tighten them using screws (as before 
  removal) to get good air tightness during boiler operation.
- put the top back cover of the boiler casing (Image 11.-PD).
- take out the lids of lower openings for cleaning the flue gas chamber        
  (Image 11-DO).
- clean flue gas chamber throught the lower openings for cleaning           
  (Image 11- DO).
- place back the lids of lower openings for cleaning (Image 11.-DO) to its original
  place and tighten them using screws to get good air tightness during boiler
  operation.

In order to clean the boiler, there is no need to remove the refractory stone 
 (chamotte).

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: