Centrometal Bio-Tec 25 Скачать руководство пользователя страница 5

5

28

PL

PL

PL

PL

PD

PD

PD

PD

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

Concerning  the  specific  need  of  sanitary  hot  water,  the  Bio-Tec  boiler  can  be 
connected  to  one  of  water  heaters  produced  by  our  company.  We  suggest  the 
combination with wall hanged SKB Digi or LKB Digi water heaters, as well as with 
standing TB water heaters and STEB solar water heaters, if the future connection to 
the  solar  system  has  been  planned 

as  also  CAS-B  or  CAS-BS,  combination  of 

accumulation tank and stainless steel DHW tank.

Wood gasification, delivery package, additional equipment 

1.2.  

THE WOOD GASIFICATION COMBUSTION PROCESS

The process is carried out in double combustion chamber in several phases. After 
fuel supply and fuel drying follows the outgasing at the temperature 100 to 300°C. 
The burning gases and different C H  joints are drawn out of the wood. The gases 

x

y

created  in  such  a  process  are  mixed  with  the  air  and  burn  out  creating  high 
temperature. 

  This  demand  for 

moisture content is fulfilled with wood dried on air at least 12 months.

Fuel:

 wood having moisture content to 20% (max. 25%), minimum size bigger than 

a  nozzle  in  refractory  stone  (chamotte)  of  the  top  chamber.

1.3.  

DELIVERY PACKAGE

3-way thermic valve 

ESBE VTC 512 

(m

aintains minimum temperature of return 

water into the boiler above 60°C

),

 VTC 531

 (m

aintains minimum temperature of 

return water into the boiler above 60°C

), 

LTC 141

 (m

aintains minimum temperature 

of return water into the boiler above 60°C

or Laddomat 21

 (m

aintains minimum 

temperature of return water into the boiler abov

 63°C) and the water accumulator 

CAS / CAS-S / CAS-B / CAS-BS

 are 

obligatory.

Bio-Tec boiler (

covered with casing

 with thermal insulation, 

built in

 boiler

 control 

unit

 and room 

thermostat

 (delivered in the boiler))

, cleaning brush and poker for 

lower refractory stone, as well as for the flue gas channels and upper 
combustion chamber cleaning, two lids of bottom openings of the flue gas 
chamber and the flue gas tube cleaning lever.

 

1.4.  

ADDITIONAL EQUIPMENT

Image 10.

 Examples of inlet construction

PD - Top back casing cover
PL  - Inlet

Examples of inlet construction

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: