Centrometal Bio-Tec 25 Скачать руководство пользователя страница 2

31

Notes

2

TECHNICAL DATA

(A1)
(B1)
(C1)

Bio-Tec 45

(mm)

recommendation:  500x70x50

max.  550x100x100

(A)
(B)
(C)

Bio-Tec 25

25

12-25

3

14

105
170
100

0,022

-

0,754

9

3,5

wooden  logs

-

12-20

97

235x250

890x600x250

134

1290

595

1285
1290

595

1345

420
450

150

80

765

1085

430
685
600

-

25

45

-

3

21

110
180

-

0,025

-

1,083

14

4

wooden  logs

-

12-20

175

235x400

1130x600x400

272

1290

725

1525
1290

725

1580

570
610

180

80

1250
1320

540
685
600
140

44

(kW)
(kW)

(Pa)

(lit.)
(°C)
(°C)

(kg/s)
(kg/s)

(kW)

(mbar)

(h)

(kW)

(%)

(l)

(mm)
(mm)

(l)

(lit./kW)

(W)

(°/bar)

(V~)
(Hz)

(mm)
(mm)
(mm)
(mm)
(mm)
(mm)

(kg)
(kg)

(bar)
(bar)

(°C)

(mm)

(R)
(R)
(R)
(R)

(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)

by  EN  305-5  point  4.2.5

250

10-15°C,  2  bar

230

50

~

-

515

2,5
5,5

90

6/4"
1/2"
3/8"
1/2"

80

685
600

underpressure

Bio-Tec 35

35

-

3

18
96

180

-
-
-
-
-

4

wooden  logs

-

12-20

144

235x400

940x600x400

226

1290

725

1330
1290

725

1385

150

1040
1130

540

130

44

Technical manual

 Bio-Tec

TYP

Other
dimensions

Technical data

Nominal heat output
Heat output range
Boiler class
Required chimney underpressure
Water amount in boiler
Exhaust gas temperature at nominal heat output
Exhaust gas temperature at minimum heat output
Exhaust mass flow at nominal heat output
Exhaust mass flow at minimum heat output
Standby heat losses
Boiler resistance on water side at nominal output
Combustion period at nominal output
Fuel type
Maximum heat input
Fuel moisture content 

Furnace volume
Wood feeding opening  AxB
Combustion chamber dimensions
Combustion chamber volume
Combustion chamber  type
Required minimum accumulation next to boiler
Electrical power input
Temp. and press. of water from water supply line into heat exchanger
Supply voltage
Frequency
Current  type

Boiler body mass
Total mass - (boiler with casing and accessories)
Max. operating overpressure
Testing pressure
Max. operating temperature
Flue gas tube – external diameter

Fuel size

Boiler
connections

Flow and return pipe (male thread)
Charge/discharge (female thread)
Heat exchanger connector (male thread)
Connector of exchanger sensor (female thread)
C2
C3
C4
B1
A1
L
L1
L2

Technical manual

 Bio-Tec

Dimensions
of the boiler
body

Boiler 
dimensions 
with casing

Lenght
Width
Height
Total lenght
Total width
Total height

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: