Centrometal Bio-Tec 25 Скачать руководство пользователя страница 1

Bio-Tec

TUBT253545-07/2012-eng

For assembling, use and maintenance
of the boiler
and additional equipment

TECHNICAL MANUAL

Centrometal d.o.o.

 - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611

HEATING TECHNIQUE

HEATING TECHNIQUE

www.centrometal.hr
e-mail: [email protected]

Centrometal d.o.o. Glavna 12, 40306 Macinec, Croatia

maloprodaja tel: +385 40 372 640
centrala tel: +385 40 372 600, fax: +385 40 372 611

Centrometal d.o.o. shall not be responsible for possible incorrect data caused by printing errors or error made in transcription and all figures and 
diagrams are for explanatory purposes only and relevant adjustment have to be made at the spot. In any case, it reserves the right to modify its products 
as deemed to be required and useful without any prior notification.

The fuel to be used is only wood under 25% humidity content (wood dried min. 1 year).

The outlet temperature always has to be over 60°C. This can be reached by obligatory connection of the 
3-way  thermic  valve  ESBE  VTC  512,  VTC  531,  LTC  141  or  Laddomat  21,  which  blocks  the  boiler 
temperature fall under the 60°C level.

The connection of CAS water accumulators is obligatory. It is recommended to connect min. 50 liters 
water accumulation to each 1 kW of boiler power.

To  the  closed  central  heating  system  an  expanding  vessel  has  to  be  connected  (the  volume  of  the 
expanding vessel is about 10% of the installation volume).

To the open central heating system an open expanding vessel has to be conneced (OPC), which volume 
has to be about 7% of the installation volume.

IMPORTANT !

Open upper boiler door (and close bottom if they open).

Put fine chopped wood to the top chamber, on refractory stone (chamotte) over the burner nozzle so 
that the nozzle is not obstructed, then put crumpled paper for ignition and fill the top chamber with fuel 
(split logs).

Close upper boiler door.

Turn the MAIN SWITCH on.

Push the button START (the LED diode flutters).

Open the middle door and ignite paper.

Couple minutes after fine chopped wood starts burning, close the middle door.

Push the button START (the LED diode lights).

(Only for Bio-Tec 25) place the button RP into position "   "

(Only for Bio-Tec 25) leave the button RP in position "   " at least 1 hour or longest to the next charge 
with wood and then restore it in the left position.

(The above actions are for ignition of the boiler from cold state (without glow). These measures should 
be implemented always when we don’t have, or don’t have enough glow, and we will load the wood).

After the regulation starts to display the lack of fuel          , the fuel should be refilled (if it is necessary to 
continue the heating process)-BEFORE REFILLING, press START button ones, when upper chamber 
is full with wood and all doors are closed press button START for second time.

It is not recommended to open the boiler's door while the light             is NOT on.

When refill the boiler with fuel the main switch must be turned on. When the firing process is over, we 
can turn off the main switch, but first it is necessary, after the indication ''FUEL''          is turned on, to 
wait that the boiler cool down under 65°C and the glow disappear in combustion chamber. Ater that the 
main switch on the control boiler unit may be turn off (see point 7.0.).

USE OF THE BOILER - QUICK OVERVIEW 

(see details under the point 6.0, 6.4., 10.0.)

Содержание Bio-Tec 25

Страница 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Страница 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Страница 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Страница 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Страница 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Страница 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Страница 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Страница 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Страница 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Страница 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Страница 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Страница 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Страница 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Страница 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Страница 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Страница 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Отзывы: