5 - TRANSPORT OPERATIONS
The machine may be further secured onto the trailer bed
with a vertical tie-down.
Put pads
(F)
over the tracks in the positions identified
along the sides of the lower frame. Route the wire ropes
(G)
across the tracks, and tie-down on the vertical direc-
tion.
NOTICE:
Make sure not to tie-down the machine only in
the vertical direction: the required tie-down force would
be high, and this will cause damages to the tracks and to
the other traction components.
SMIL20CEX0036AA
6
5-10
Содержание CX130C
Страница 16: ...1 GENERAL INFORMATION 1 10...
Страница 34: ...2 SAFETY INFORMATION SMIL20CEX1386HA 2 2 18...
Страница 75: ...3 CONTROLS AND INSTRUMENTS Display SMIL18CEX0554FB 2 SMIL18CEX0534FB 3 3 29...
Страница 112: ...3 CONTROLS AND INSTRUMENTS 3 66...
Страница 134: ...4 OPERATING INSTRUCTIONS 4 22...
Страница 150: ...5 TRANSPORT OPERATIONS 5 16...
Страница 199: ...6 MAINTENANCE Bucket cylinder bottom pin one grease fitting SMIL18CEX0523AA 7 6 49...
Страница 231: ...6 MAINTENANCE 8 Check that the tooth is securely fastened CA1C6271 3 6 81...
Страница 240: ...6 MAINTENANCE 6 90...
Страница 251: ...8 SPECIFICATIONS Working ranges SMIL20CEX1394HA 4 8 9...
Страница 254: ...8 SPECIFICATIONS 8 12...
Страница 278: ...9 ACCESSORIES 9 24...