![Carrier ZS Plus Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/carrier/zs-plus/zs-plus_installation-manual_2560240063.webp)
Relative Humidity sensors
Carrier Sensors
CARRIER CORPORATION ©2021
Installation Guide
All rights reserved
59
To wire and mount the Outdoor RH sensor
See sensor diagram in
To wire and mount the Duct RH sensor
(page 57).
1
Use the 2 mounting screws provided to secure the sensor.
2
Remove the cover and install conduit connectors, watertight fittings, and/or 1/2” vent plug.
NOTE
The inner ring will knock out first. Then tap the outer ring in 1 or 2 locations with a screwdriver to peel
it out. The cover will be connected to the housing by the sensor leads.
3
At the sensor end of the cable, strip back the jacket from the cable for at least 3 inches. Strip 1/4 inch of
insulation from each conductor. If using shielded cable, cut the shield and drain wire from the cable.
4
Wire the unit for power. See
Typical power wiring diagrams for Duct RH and Outdoor RH sensors
(page 60).
5
Wire the sensor to the Open controller. See diagrams below and the controller's
Installation and Startup
Guide
for details.
Input
Output
Wiring diagram
15
–
36 Vdc
4
–
20 mA
18
–
36 Vdc or
21.6
–
26.4 Vac
0
–
10 Vdc
6
Place the cover onto the unit and gently turn until it is tight.
7
Verify that you are getting a humidity reading.
NOTE
Allow up to 20 minutes after powering up for the sensor reading to stabilize.