![Carrier ZS Plus Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/carrier/zs-plus/zs-plus_installation-manual_2560240062.webp)
Relative Humidity sensors
Carrier Sensors
CARRIER CORPORATION ©2021
Installation Guide
All rights reserved
58
8
Wire the sensor to the Open controller. See diagrams below and the controller's
Installation and Startup
Guide
for details.
Input
Output
Wiring diagram
18
–
36 Vdc
4
–
20 mA
18
–
36 Vdc or
21.6
–
26.4 Vac
0
–
10 Vdc
9
Place the sensor's cover onto the probe unit and gently turn until it is tight.
10
Verify that you are getting a humidity reading.
NOTE
Allow up to 20 minutes after powering up for the sensor reading to stabilize.
Downloaded from