Installing the VAV Zone II
VAV Zone II Controllers
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
9
1
Mount the controller to the VAV terminal.
(page 9)
2
Wire the controller for power.
(page 14)
3
Set the controller's address.
(page 15)
4
Connect the controller to the BACnet MS/TP or BACnet ARC156 network.
(page 15)
5
Wire devices to the Rnet port
(page 16).
6
Wire sensor(s) to the controller.
(page 22)
7
Wire equipment to the controller's outputs.
(page 26)
Mounting the VAV Zone II
To mount the controller and actuator
To disconnect and mount the controller and actuator separately
Disconnect the actuator from the controller by inserting a screw driver in the slot on the back of the VAV Zone II
and pressing the tab. The actuator cable or an attached extension cable must connect to the controller's
Act Net
port.
Installing the VAV Zone II
Содержание VAV Zone II
Страница 109: ......