Document revision history
VAV Zone II Controllers
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
104
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Change description
Code*
8/30/19
Zone Airflow Control
Adjusted Damper Actuator travel time
C-TS-RD-E
Unit Configuration
Removed limit on Setpoint Adjustment Range
C-TS-CP-E
1/25/19
Wiring devices to the VAV Zone II's Rnet
port
Removed star configuration from the first paragraph.
X-TS-TS-O
Specifications
Added surge CAUTION to Protection specification.
X-TS-AK-E-CC
12/17/18 Wiring the VAV Zone II for power > To
wire the controller for power.
Added photograph of lifting up the cover.
CA-H-RE-E-CC-
JS
Mounting the VAV Zone II > To mount
the controller and actuator
Added caution stating that you must use the bushing, O-ring, and
screws that are shipped with the VAV Zone II, along with
applicable graphic.
CA-H-RE-E-CC-
JS
10/30/18 Wiring sensors to the VAV Zone II's
inputs > To wire the T55 sensor to the
controller
Removed reference to SPT sensors.
C-D
Sequence of operation > Temperature
sensors
Removed SPT sensors.
C-D
Wiring equipment to the VAV Zone II's
outputs > Wiring diagram legend
Removed SPT sensors. Now shown as "Space temp sensor" in
diagrams.
C-D
8/28/18
Wiring devices to the VAV Zone II's Rnet
port
Added TruVu™ ET Display.
Made one topic for overview and wiring for each device.
Removed SPT sensor detail.
C-D
Specifications
Reworded Rnet port specification and added power supplied by
Rnet port.
Added first paragraph to Protection specification.
X-H-JS-O
8/2/18
To wire the CO2 sensor to the
controller
Diagram for the #33ZCT55CO2 corrected to show wiring to J5 - 3
and 2, not 1 and 2.
C-TS-CP-E-WB
* For internal use only
Document revision history
Содержание VAV Zone II
Страница 109: ......