11
3.3 - 30XBP-500, 30XB-500 with options 254/255, 50 (heat recovery) or 118A (free cooling)
2
1
1
1
1
POWER AND
CONTROL
ELECTRICAL
BOX
1500
2200
1500
1500
2253 HT
5992 HT
2297 HT
3.4 - 30XB-600 to 900, 30XBP-600 to 800, 30XB-600 to 700 with option 254/255
POWER ELECTRICAL BOX
1500
2200
1500
1500
2253 HT
7186 HT
2297 HT
2
1
1
1
1
Legend
NOTES:
-
Drawings are not contractually binding.
-
Before designing an installation, consult the certified
dimensional drawings, available on request.
-
For the positioning of the fixing points, weight distribution
and centre of gravity coordinates please refer to the
dimensional drawings.
-
If the installation includes several units or if this (these)
is (are) close to walls, please refer to chapters 3.12 -
“Multiple chiller installation” and 3.13 - “Distance to the
wall” of this document to determine the space required.
All dimensions are given in mm.
a
Required clearances for maintenance (see note)
b
Recommended space for evaporator tube removal
Water inlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the certified drawing.
Water inlet for standard unit
For options 5, 6, 100A, 100C, 107 refer to the certified drawing.
Air outlet – do not obstruct
Power supply and control connection
3 - DIMENSIONS, CLEARANCES
Содержание AquaForce 30XB series
Страница 69: ......