SRS-12H MANUAL
Chapter 2: Installation
9
2-3 FIX THE MACHINE IN POSITION
1. PROPER LOCATION FOR THE MACHINE
:
◎
The floor must be strong enough to support the machine's weight as well as the
vibrations produced while it is running.
◎
The directions of feed workpiece in and out from the machine must not be facing
the area where people may be passing frequently.
2. LEVELING THE MACHINE
:
Place a leveler on the top of feed chain blocks. According to the indication of
the leveler to adjust the height of 4 sets of foundation screws on the lower of the
machine until the axial tolerances of the X and Y axes are all within 0.3mm/m.
After complete the leveling process, be sure to re-tighten the foundation screws.
2-4 POWER CONNECTION
)
The power source should be connected by a qualified electrician.
◎
All wirings must conform to international safety guidelines, choose a most
suitable size of cable subject to the voltage and mounting motors.
◎
A suitable breaker should be installed on the cable that between the main power
supply and the machine, so that the power supply to the machine can be shut off
when not in use.
◎
Check and confirm the machine is proper grounded while in use to protect
the operator from electric shock
.
2-5 START-UP TEST
After the machine has been installed in accordance with the above regulations and a
check has been made to ensure that there is no obstruction surrounding the machine,
the following start-up test should be performed:
1)
Be sure the power supply has been connected and check if the power indicator
lights up.
Содержание C12RSH
Страница 5: ......
Страница 9: ...SRS 12H MANUAL Chapter 1 Introduction 4 1 3 LOCATION OF PARTS...
Страница 12: ...SRS 12H MANUAL Chapter 1 Introduction 7 Machine size...
Страница 37: ......