3
3-10
No.
Tx/Rx
Description
##0769
[Tx]
At time of ECM transmission, the procedural signal has been transmitted more
than specified after transmission of PPS-EOP, or T5 time-out (60 sec) has
occurred.
##0770
[Tx]
At time of ECM transmission, no meaningful signal is received after
transmission of EOR-NULL, causing the procedural signal to be transmitted
more than specified.
##0772
[Tx]
At time of ECM transmission, DCN is received after transmission of EOR-
NULL..
##0773
[Tx]
At time of ECM transmission, the procedural signal has been transmitted more
than specified after transmission of EOR-NULL, or T5 time-out (60 sec) has
occurred.
##0774
[Tx]
At time of ECM transmission, ERR is received after transmission of EOR-
NULL..
##0775
[Tx]
At time of ECM transmission, no meaningful signal is received after
transmission of EOR-MPS, causing the procedural signal to be transmitted
more than specified.
##0778
[Tx]
At time of ECM transmission, the procedural signal has been transmitted
more than specified after transmission EOR-MPS, or T5 time-out (60 sec) has
occurred.
##0779
[Tx]
At time of ECM transmission, ERR is received after transmission of EOR-
MPS.
##0780
[Tx]
At time of ECM transmission, no meaningful signal is received after
transmission of EOR-EOM, causing the procedural signal to be transmitted
more than specified.
##0782
[Tx]
At time of ECM transmission, DCN is received after transmission of EOR-
EOM.
##0783
[Tx]
At time of ECM transmission, the procedural signal has been transmitted more
than specified after transmission of EOR-EOM, or T5 time-out (60 sec) has
occurred.
##0784
[Tx]
At time of ECM transmission, no meaningful signal is received after
transmission of EOR-EOP, causing the procedural signal to be transmitted
more than specified.
##0787
[Tx]
At time of ECM transmission, DCN is received after transmission of EOR-EOP.
##0788
[Tx]
At time of ECM transmission, the procedural signal has been transmitted more
than specified after transmission of EOR-EOP, or T5 time-out (60 sec) has
occurred.
##0789
[Tx]
At time of ECM transmission, ERR is received after transmission of EOR-EOP.
##0790
[Rx]
At time of ECM reception, ERR is transmitted after transmission of EOR-Q.
##0791
[Tx]
While ECM mode procedure is under way, a signal other than a meaningful
signal is received.
##0792
[Rx]
At time of ECM reception, PPS-NULL cannot be detected over partial page
processing.
##0793
[Rx]
At time of ECM reception, no effective frame is received while high-speed
signal reception is under way, thus causing time-out.
##0794
[Tx]
At time of ECM reception, PPR with all 0s is received.
##0795
[Tx/Rx] A fault has occurred in code processing for communication.
T-3-4
T-3-4
Jam Code
Main Unit
550-sheet 1st cassette model
S1
S5
S7
S19
S12
S42
S40
•
F-3-1
F-3-1
Содержание IMAGERUNNER 2530
Страница 9: ...1 1 Periodical Service Consumable Parts and Cleaning Parts ...
Страница 13: ...1 5 1 Cleaning Parts Fixing guide Transfer guide F 1 2 F 1 2 ...
Страница 14: ...2 2 Adjustment Overview Adjustment when replacing parts image position adjustment ...
Страница 20: ...3 3 Error Code Overview Error Code Jam Code Alarm Code ...
Страница 34: ...4 4 Service Mode Overview Details of Service Mode ...
Страница 85: ...5 5 Parts Replacement and Cleaning List of Parts ...
Страница 98: ...6 6 Product Overview Specifications Product lineups Basic Configuration ...
Страница 106: ...7 7 Version Upgrading Upgrading Targets and Procedure ...