CanadianSolar CSI-25K-T480GL01-UB Скачать руководство пользователя страница 7

2. Safety Instructions

2.4 Protection Circuitry and Controls

.11.

.10.

2. Safety Instructions

WARNING

 

To reduce the risk of fire, branch circuit over-current protective 

devices (OCPD) are required for circuits connected to the Inverter.

CAUTION 

The PV array (solar panels) supplies a DC voltage when exposed to light.

CAUTION 

Risk of electric shock from energy stored in the inverter's capacitors. 
Do not remove cover until five (5) minutes after disconnecting all sources 
of supply have passed, and this can only be done by a service technician. 
The warranty may be voided if any unauthorized removal of cover occurs.

CAUTION

The inverter's surface temperature can reach up to 75

C (167

F). To avoid 

risk of burns, do not touch the surface when the inverter is operating. 
Inverter must be installed out of the reach of children.

WARNING

 

The inverter can only accept a PV array as a DC input. Using any other 

type of DC source could damage the inverter.

The inverter has been constructed according to applicable safety and technical guidelines. 

Use the inverter in installations that meet the following requirements ONLY:

       1).  The inverter must be permanently installed.

       2).  The electrical installation must meet all the applicable regulations and standards.

       3).  The inverter must be installed according to the instructions stated in this manual.

       4).  The system design must meet inverter specifications.

To start-up the inverter, the Grid Supply Main Switch (AC) must be turned on, BEFORE the DC 

Switch is turned on. To stop the inverter, the Grid Supply Main Switch (AC) must be turned off

before the DC Switch is turned off.

2.3 Notice for use

To meet relevant codes and standards, the Canadian Solar three phase inverter line is 

equipped with protective circuitry and controls.  These include Arc Fault Circuit Interrupter 

(AFCI) and Anti-Islanding Protection.

Arc Fault Circuit Interrupter AFCI:

  

       Edition 2011 of the National Electrical Code®, Section 690.11, requires that all PV plants 

       attached to a building are fitted with a means of detecting and interrupting serial electric 

       arcs in the PV wiring and array. An electric arc with a power of 300W or greater must be 

       interrupted by the AFCI in the time specified by UL 1699B. A triggered AFCI fault may only 

       be reset manually. After clearing the source of the fault, the AFCI can be deactivated via 

       the inverter front panel interface.

Anti-Islanding Protection: 

       Islanding is a condition where the inverter continues to produce power even when the grid 

       is not present.  Circuitry, along with firmware, has been designed to determine if the grid is 

       present by adjusting the output frequency of the inverter.  In the case of a 60Hz resonant 

       system where the inverter is partially isolated from the grid, the inverter programming can 

       detect if there is a resonant condition or if the grid is actually present.  It can also 

       differentiate between inverters operating in parallel and the grid.

Содержание CSI-25K-T480GL01-UB

Страница 1: ...199 Lushan Road SND Suzhou Jiangsu China 215129 P 1 519 837 1881 F 1 519 837 2550 Sales Inquiries Email info csisolar com Customer Support Email service ca csisolar com This manual is subject to chang...

Страница 2: ...quipment has supplied The customer is fully liable for any modifications made to the system therefore any hardware or software modification manipulation or alteration not expressly approved by the man...

Страница 3: ...the AC side of the inverter 24 3 6 1 Connecting the inverter to the utility grid 25 3 6 2 Wiring procedure 25 4 Communication Monitoring 4 1 RS485 4 1 1 Wiring a single inverter and daisy chain inver...

Страница 4: ...2 1 Viewing alarm history 8 3 Error messages 8 3 1 Troubleshooting guide 10 Specifications 9 Appendices 76 7 Maintenance Canadian Solar Three Phase Inverters convert DC power from the photovoltaic PV...

Страница 5: ...te cartons When unpacking please verify all the parts listed below are included Inverter power train packing list Part 1 1 1 2 Description Inverter Power Train Power Train packaging accessories Number...

Страница 6: ...stallations must be done in accordance with local and national electrical safety standards 9 8 Use the original box to repackage the inverter seal with adhesive tape with the desiccant inside the box...

Страница 7: ...meet inverter specifications To start up the inverter the Grid Supply Main Switch AC must be turned on BEFORE the DC Switch is turned on To stop the inverter the Grid Supply Main Switch AC must be tur...

Страница 8: ...d on site a minimum clearance of 20 inches should be kept between each inverter and all other mounted equipment The bottom of the inverter should be at least 20 inches above of the ground or floor see...

Страница 9: ...ter the general properties of the room etc and the quality of the electricity supply the sound level from the inverter can be quite high 3 2 Product handling Please review the instructions below for h...

Страница 10: ...4 40 flat washer 10 nut M10 to attach the inverter bracket on the mounting rack The tightening torque is 17 6 22 1 ft lbs 3 3 1 Installation NOTE If it is not installed on a faat wall the inverter mus...

Страница 11: ...side Do not tighten as these will be used later 3 Hang the wire box on the mounting plate 19 18 6 Unscrew the six M5 captive screws on the wire box cover and remove the cover 4 Attach the wire box wi...

Страница 12: ...gure 3 9 Grounding terminal block on the metal bracket The Canadian Solar Three Phase Inverter wiring box is designed for easy access to all connection terminals including monitoring communication por...

Страница 13: ...input channels for connecting DC strings Each channel is protected by a fuse The included fuses are rated at 20A Replace fuses with like size and type Do not exceed 20A fuse rating Figure 3 10 Eight...

Страница 14: ...er bi metallic terminal or anti oxidant grease with aluminum cables and terminals 3 6 2 Wiring procedure CAUTION RISK OF ELECTRIC SHOCK Prior to starting the wiring procedure ensure that the three pol...

Страница 15: ...nstalling the inverter 2 Loosen the M6 screws on both sides of the wire box Do not remove the screws Hex screx M6 3 Lift the inverter power train and hang it on the top of the mounting bracket Step 1...

Страница 16: ...power train and the wire box exactly to avoid damage to the inverter 4 If the installation position is relatively high a lift or scaffolding may be necessary to install the inverter NOTE Ensure the to...

Страница 17: ...Level Rapid Shutdown Optional For systems that are required to meet NEC 2017 NEC 690 12 Canadian Solar has an optional Module Level Rapid Shutdown This product provides a panel level shutdown feature...

Страница 18: ...e inverters per RS 485 daisy chain is 32 pcs Please contact monitoring supplier for details 4 1 3 120 ohm resistor placement 120 resistor placement for end of line communication Please contact monitor...

Страница 19: ...cable of the string under test Connect the negative lead of the meter to the negative string cable of the string under test 3 Measure the voltage present between the positive and negative pole of eac...

Страница 20: ...ecord of the phase configuration of the installation 5 2 Selecting the appropriate grid standard WARNING Failure to set the correct grid standard could result in improper operation of the inverter inv...

Страница 21: ...23 19 35 Select Standard R21P3 480 ESC UP DOWN ENT Y E S E N T N O E S C Save Cancel 2015 02 23 19 35 Save Send Cancel Exit Y E S E N T N O E S C 4 Select the grid standard for the country of installa...

Страница 22: ...rformed 2 Switch the AC switch ON 3 Switch the DC switch ON If the PV array DC voltage is higher than the inverter s start up voltage the inverter will turn on The red DC POWER LED and LCD will be con...

Страница 23: ...menu main menu Figure 6 1 Operational flow overview 6 3 7 LCD front panel display interface The initial interface of the inverter see Figure 6 2 shows the current operational status current power the...

Страница 24: ..._DC4 V_A V_B V_C I_DC1 I_DC2 I_DC3 I_DC4 I_A I_B I_C 30000W 500 2V 500 5V 499 9V 502 6V 232 0V 231 0V 230 5V 15 90A 15 70A 15 30A 16 10A 43 5A 43 7A 43 4A ESC UP DOWN ENT Information 2015 02 23 19 35...

Страница 25: ...ings Press the ESC key to cancel the change and return to the previous menu 6 5 2 Setting inverter address for communications Figure 6 9 Address setting Set Address 2015 02 23 19 35 Y E S E N T N O E...

Страница 26: ...es Alarm Message 2015 02 23 19 35 Message NO Grid NO Grid NO Grid NO Grid NO Grid Date Time 02 23 19 35 02 23 19 34 02 23 19 34 02 23 19 24 02 23 18 22 01 40 0000 0000 0000 0000 0000 ESC UP DOWN ENT T...

Страница 27: ...the ENTER key to move cursor and press the UP or DOWN key to select energy details for a different month 6 6 6 Monthly Energy Figure 6 18 Monthly power generation details The screen shows the inverter...

Страница 28: ...echnicians only The inverter is customized according to the local standard before shipping There should be no requirement to set the standard The User Def function can be only used by the service engi...

Страница 29: ...of the User Def standard is for reference only It does not represent a correct value suitable for use OV G V1 236 335V OV G V1 T 0 1 9S OV G V2 248 341V OV G V2 T 0 1 1S UN G V1 173 236V UN G V1 T 0...

Страница 30: ...eset the inverter s yield Restore Settings will reset all the settings to factory default NOTE These two functions should be accessed by qualified maintenance personnel only Operating the inverter wit...

Страница 31: ...nput The Current Password X X X X ESC UP DOWN ENT Y E S E N T N O E S C After entering the current password you can create a new password Upon confirming the new password press the ENTER key to execut...

Страница 32: ...O N E E S C This function is applicable by maintenance personnel only wrong operation will prevent the inverter from reaching maximum power 6 7 8 1 5 GRID INTF 02 6 7 8 1 6 MPPT Parallel This is used...

Страница 33: ...on VRT_US voltage ride through and FRT_US frequency ride through operation are used for UL1741SA Selecting the setting to Enable will enable the inverter grid protection limits in accordance with UL17...

Страница 34: ...iption Inverter is not under any working mode 3 Volt Var Default Description Inverter will change the reactive output power based on voltage change Q1 cap Q2 Q3 0 Q4 ind V1 V2 Vnom V3 V4 Figure 6 24 V...

Страница 35: ...the Volt Watt Setting for UL1741SA Standards Default Settings for UL1741SA Rated 480V Grid V1 less than V2 V2 less than Vstart V3 Vstart 277 333V Default305V V4 Vstop 305 360V Default 333V P1 100 P2...

Страница 36: ...V V4 larger than Vstop P1 100 P2 100 P3 0 P4 0 3 Volt Var Description Inverter will change the reactive output power based on voltage change Q1 cap Q2 Q3 0 Q4 ind V1 V2 Vnom V3 V4 Figure 6 31 Volt VAR...

Страница 37: ...quired Description Inverter will change the active output power based on voltage change Note This Setting is NOT required by Rule21 Standards This function is for maintenance personnel only wrong oper...

Страница 38: ...power ramp up rate is limited in this menu The setting range from 5 to 600 means inverter power change rate per minute Values are not allowed to change If they are set they may not conform to the UL...

Страница 39: ...ill reset each work mode back to default This function is applicable by maintenance personnel only wrong operation will prevent the inverter from reaching maximum power 6 7 9 5 Voltage PCC Set Set the...

Страница 40: ...hts Other readings obtained from the Information sub menu refer to Section 6 4 will also be helpful 5 PV array configuration e g number of panels panel capacity number of strings etc 6 Your contact de...

Страница 41: ...adjust lower limit with permission from utility Check LCD voltage reading may be a bad measurement circuit Test DC Switch ON Check grid standard Replace inverter Alarms Cause Solution Inverter detect...

Страница 42: ...inverter PV ISO PRO 01 02 Ground Protection Inverter detects low DC insulation resistance Inspect installation Reset inverter Note weather conditions when alarm occurs Measure insulation resistance I...

Страница 43: ...erating altitude without derating Designed lifetime Natural convection 13120ft 4000m 20 years Yes 480 422 4 528 60 4 8 25000 25000 25000 40 30 1 0 II III 40 200 Max output fault current Amps and durat...

Страница 44: ...cy Protection CSI 30K T480GL01 UB General Data Max usable input current Amps Max short circuit input current Amps 72 18 per MPPT 112 4 28 1 per MPPT Enclosure type Noise emission typical NEMA 4X 30 dB...

Страница 45: ...l Data 9 Specifications 9 Specifications 87 86 Enclosure type Noise emission typical NEMA 4X 30 dBA Cooling concept Max operating altitude without derating Designed lifetime Natural convection 13120ft...

Страница 46: ...l Data 9 Specifications 9 Specifications 89 88 Max usable input current Amps Max short circuit input current Amps 72 18 per MPPT 112 4 28 1 per MPPT Enclosure type Noise emission typical NEMA 4X 30 dB...

Страница 47: ...output power 100 50 0 45 60 T P 25 10 Appendices P V curve for CSI 25K T480GL01 UB Power W 25000 14400 200 347 800 990 1000 Voltage V P V curve for CSI 30K T480GL01 UB Power W 30000 14400 200 417 850...

Страница 48: ...14400 200 500 800 990 1000 Voltage V P V curve for CSI 40K T480GL01 UB Power W 40000 14400 200 556 800 990 1000 Voltage V Figure 10 5 CSI 36K T480GL01 UB Inverter output power by input voltage Figure...

Страница 49: ...ompleted Record V AC in Notes 10 Grounding cable Good Poor INSTALLATION Check inverter condition after unpacking Install inverter mounting bracket according to installation instructions in user manual...

Страница 50: ...cable to the communication port 1 Switch the grid supply main Switch AC ON rst 2 Switch the DC switch ON If the voltages of PV arrays are higher than start up voltage the inverter will turn on The re...

Страница 51: ...eted Record address in Notes 7 Machine version For maintenance and reference please record the irmware revisions if applicable Completed Record with serial numbers 8 Operating parameter Record operati...

Страница 52: ...ting tilt Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max Min Reactive compensation PF Coniguration MPPT Individual MPPT Parallel Monitoring RS485 E...

Страница 53: ...to inverter site selection and installation 3 PHASE STRING INVERTERS KTL SERIES CSIF ST 016 A 0 INSTALLER S NAME INSTALLER S SIGNATURE COMPANY DATE Inverter serial numbers 1 2 3 4 5 6 7 8 9 10 11 12 1...

Отзывы: