ADC 2
2.
Installation
2.1
.
Instrument
)
Observe the environmental requirements (2.2 Installation envi-
ronment) when setting up the instrument.
9
Carefully unpack all components and accessories listed on
the shipping list from the upper part of the packing. Make
sure the shipment is complete.
9
Remove the instrument carefully from the package and
place it on a table.
Attention:
Do not pull out the instrument by holding it at the
blue top-cover; hold the instrument at the bottom when tak-
ing it out of the package and carrying it around!
9
Remove carefully the fixation under the Drying module.
9
For shipment, the Twin Trough Chamber has been securely
positioned below the bottom of the instrument.
Fig. 1: The ADC2 instrument
Manual, August 2005
Page 5
Home
Содержание ADC 2
Страница 40: ...ADC 2 Manual August 2005 Page 40...