User Manual – Rev B
FCS Series II
11.8.2 LxGui MS704 Test Screen
The –704F option interface screen is shown below. (Figure 11-13). Settings can be made
through a series of tabbed dialogs in the center of the screen. Any EUT information can be
entered at the bottom. This information will be transferred to the test report.
Test execution is controlled using the Start / Abort buttons to the left. The right hand side of this
window provides output monitoring for voltage (all three phases in 3 phase mode) and
frequency. During a test run, this data is updated once a second. A log of readings is
automatically kept.
Figure 11-13: LxGui MS704 Option Screen
All test selection and execution modes are set from this screen.
California Instruments
192
Содержание FCS Series II
Страница 4: ...User Manual Rev B FCS Series II California Instruments 4...
Страница 27: ...User Manual Rev B FCS Series II California Instruments 27...
Страница 28: ...User Manual Rev B FCS Series II Figure 3 1 Rear Panel Connector Locations California Instruments 28...
Страница 35: ...User Manual Rev B FCS Series II Figure 3 4 FCS54 3 3 Wiring Diagram Three Phase mode California Instruments 35...
Страница 36: ...User Manual Rev B FCS Series II Figure 3 5 FCS54 3 1 Wiring Diagram Single Phase mode California Instruments 36...
Страница 89: ...FCS Series II 89 Figure 5 1 FCS System Block Diagram User Manual Rev B California Instruments...
Страница 92: ...User Manual Rev B FCS Series II Figure 5 2 Power Amplifier Exploded View California Instruments 92...
Страница 95: ...User Manual Rev B FCS Series II Figure 6 1 Calibration Setup California Instruments 95...
Страница 109: ...User Manual Rev B FCS Series II Figure 7 1 Front panel location Figure 7 2 Fuse Locations California Instruments 109...
Страница 118: ...User Manual Rev B FCS Series II ure 8 4 Voltage Modulation Frequency characteristics Fig California Instruments 118...