8
3. Remove the electrical switch nut (C) by unthreading it from the push button switch (H).
Place it aside. Refer to Figure 1.
4.
Carefully pull the bottom of the plastic cover over the power outlet. Lift the base cover up
around
6”
(A). Then disconnect red and black wires form green indicator light (I) attached
to internal connectors, refer to Figure 3A. To release wire lift corresponding orange tab
from each connector, refer to Figure 3B.
5. Take the non
-
flared end of the post base and slide it through the post opening of the
base cover. This can be seen in Figure 4.
6. Using the 2.5mm Allen key, remove the M3 screw on the post. It is located approximately
half way up the post. Refer to Figure 4, 5.
7. Slide the cover towards the flared end of the post as far as possible. Then re
-
install the
M3 screw into the post. This is to hold the cover up while other work is done. Refer to
Figure 5.
Figure 3A.
Figure 3B.
Figure 4
M3 screw location
Figure 5: M3 post screw.
Содержание AIMLED070 Series
Страница 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Страница 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Страница 38: ...38 Figure 48 Anchorage Seismic wall model ...
Страница 39: ...39 Figure 49 Anchorage Seismic wall model ...
Страница 42: ...42 13 0 Equipment Maintenance Log ...
Страница 43: ...43 NOTES ...