21
1.
Route conduit and electrical lines from wall switch to wall mount. Connect green ground
wire to either of green terminal blocks labeled with ground symbol. Connect Line and
Neutral wire to orange quick disconnect connector, refer to Figure 26A & B.
NOTE:
the
terminal block is marked with numbers and electrical symbols to designate correct
wiring.
2.
Install the cover on the wall mount and secure it by tightening the 4 screws with serrated
lock washers on the sides.
NOTE:
Serrated washer must be in place to ensure proper
grounding of the cover.
Figure 26B: Wall mount wiring diagram.
For instruction on how to install Extension/Spring Arm to wall mount follow steps in section
“
8.0 Extension/Spring Arm
-
Wall and Ceiling Assembly
”
For instruction on how to Mounting the Light Head to the Spring Arm follow steps in section
“
9.0 Mounting the Light Head to the Spring Arm
”
Ground (G)
Neutral (N)
Line (L)
Field replaceable fuse
T2A 250V
Содержание AIMLED070 Series
Страница 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Страница 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Страница 38: ...38 Figure 48 Anchorage Seismic wall model ...
Страница 39: ...39 Figure 49 Anchorage Seismic wall model ...
Страница 42: ...42 13 0 Equipment Maintenance Log ...
Страница 43: ...43 NOTES ...