7
A
C
D
E
D
F
H
B
B
I
Figure 1.
Part
#
Qty
Description
A
1
Base Cover
B
4
Base Cover Screws
C
1
Electrical Switch Nut
D
2
M8 Attachment Bar Screw and Lock Washer
E
1
Post Attachment Bar
F
1
Ground Screw and Washers
G
1
Post/Upright (not shown below)
H
1
Push Button Switch
I
1
Green Indicator Light
4.0 Floor Stand Model
4.1 Base Post Assembly
Parts (Refer to Figure 1)
Assembly Instructions:
1.
Using your finger release the fuse holder on the power outlet by pushing downward on
the tab and pulling outward. Place the fuse holder aside. See Figure 2.
2.
Using a 3mm Allen Key, remove four (4) x M4 screws (B) from underside of base to
release the plastic cover. Place screws aside for reassembly. Refer to Figure 1.
Fuse Holder
Figure 2.
Содержание AIMLED070 Series
Страница 36: ...36 10 0 Equipment Anchorage Diagrams Figure 46 Anchorage Seismic single ceiling model ...
Страница 37: ...37 Figure 47 Anchorage Seismic double ceiling model ...
Страница 38: ...38 Figure 48 Anchorage Seismic wall model ...
Страница 39: ...39 Figure 49 Anchorage Seismic wall model ...
Страница 42: ...42 13 0 Equipment Maintenance Log ...
Страница 43: ...43 NOTES ...