
Chapter 2: Server Installation
2-3
Always keep the rack's front door and all panels and components on the serv-
•
ers closed when not servicing to maintain proper cooling.
Make sure all power and data cables are properly connected and not blocking
•
the chassis airfl ow. See Chapter 5 for details on cable connections.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating tem-
perature of the rack environment may be greater than the ambient temperature
of the room. Therefore, consideration should be given to installing the equipment
in an environment compatible with the manufacturer’s maximum rated ambient
temperature (Tmra).
Reduced Airfl ow
Equipment should be mounted into a rack so that the amount of airfl ow required
for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not
arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power
supply circuitry and the effect that any possible overloading of circuits might have
on overcurrent protection and power supply wiring. Appropriate consideration of
equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself
should be grounded. Particular attention should be given to power supply con-
nections other than the direct connections to the branch circuit (i.e. the use of
power strips, etc.).
Содержание R424-E2
Страница 1: ...R424 E2 R424 INF E2 R424 F2 R424 INF F2 Installation and User s Guide bullx REFERENCE 86 A1 61FE 01...
Страница 2: ......
Страница 12: ...X bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide...
Страница 20: ...1 8 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide Notes...
Страница 29: ...Chapter 2 Server Installation 2 9 Figure 2 6 Installing into a rack...
Страница 38: ...3 4 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide Notes...
Страница 86: ...5 44 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide Notes...
Страница 103: ...Chapter 6 Advanced Chassis Setup 6 17 Figure 6 24 Placing air shroud on the serverboard...
Страница 146: ...8 34 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide...
Страница 148: ...A 2 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide Notes...
Страница 158: ...B 10 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide...
Страница 178: ...C 20 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide...
Страница 180: ...D 2 bullx R424 E2 R424 INF E2 and R424 F2 R424 INF F2 Installation and User s Guide...
Страница 181: ......
Страница 182: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 61FE 01...