User Guide
79
www.bull.com
7.
Install the server chassis into the rack.
a.
Align the inner rails (attached to the server chassis) with the outer rail
assemblies (attached to the rack). See letter “A”.
Note: The inner slides must be positioned all the way
forward in the rails to ensure proper installation of the server.
b.
Engage the matching rails and slide the server chassis into the rack
(letter “B”
) until the two safety stops lock into position (letter “C”).
Figure 42: Installing the Server Chassis into the Rack (step 1)
A: Front of the rack
Содержание NovaScale R410 E1
Страница 1: ...NovaScale T810 E1 T830 E1 R410 E1 User s Guide NOVASCALE REFERENCE 86 A1 15FA 00 ...
Страница 2: ......
Страница 34: ...User Guide 34 www bull com Motherboard Motherboard Layout Figure 14 Motherboard Layout ...
Страница 53: ...User Guide 53 www bull com SAS Hard Disk Drive Capacity 73GB minimum 15000 RPM RAID support ...
Страница 294: ...User Guide 294 www bull com Boot Manager Menu Allows you to boot the system using one of the items listed in the menu ...
Страница 295: ...User Guide 295 www bull com Error Manager Menu The Error Manager Menu displays any errors encountered during POST ...
Страница 318: ......
Страница 319: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 15FA 00 ...