
MAKSİCONDENSE 48-65
Notes
01/2018
84
Training 0020260859_00
3.3.5.7 New! Pump identification
When the unit is started, the electronics check the available unit pump with an identification routine.
This routine is only available in the pump electronics for the Grundfos UPMM 25
–105 (65 kW) pump.
No routine is available for the Grundfos UPMM 25
–85 (48 kW) pump
The pump sends the following diagram via the PWM analysis response:
Pump
Type
Response 1
[2 s]
Response 2
[2 s]
Response 3
Grundfos UPMM
25
–105
10.5 m
60%
± 2%
90%
± 2%
100%
In the output range of
65 kW
the Grundfos UPMM 25
–105 pump must always be
selected for pump replacement. Otherwise, the pump is not recognised by the unit
electronics.
3.3.5.8 New! Automatic purging function
Start condition and boiler purging:
If the unit/system pressure has fallen below
0.3 bar
for at least
15 seconds
, the point for a purging
sequence is set. The unit/installation purging is started from
0.5 bar
.
If the heating pressure in the primary circuit rises above
0.5 bar
for
30 seconds
(start-up), an auto-
matic purging function starts. The function starts repeatedly if the system pressure has fallen below
0.3 bar
for at least
15 seconds
(e.g. purging of heating surfaces or other causes) during servicing
(maintenance). After filling the installation, the purging starts if
0.5 bar
has been exceeded for at
least
30 seconds
.
─
The function cannot be stopped, even by the competent person.
─
The burner does not start before the purging process has been completed.
─
After the purging, no air remains in the unit, which reduces the risk of damage
caused by cavitation and of noises in the heating installation.
─
Stored time periods for automatic purging: Domestic hot water circuit
390 seconds
;
heating circuit
390 seconds
.
Following the automatic purging, the volume flow is measured (heating circuit or hot-water charg-
ing circuit) to ensure that the unit has been purged. Purging is completed when the threshold of the
low volume flow (Lower Flow Rate) has been exceeded.
If the threshold has not been exceeded, the purging function was not fulfilled and fault
F.75
is dis-
played.
Содержание Thema Condens AS 48-A
Страница 1: ...DEM RD K M MAKS CONDENSE 48 65...
Страница 2: ......
Страница 5: ...8 4 2 Gas consumption relating to nominal load 191 8 5 System checklist 192...
Страница 6: ......
Страница 12: ...MAKS CONDENSE 48 65 Notes 01 2018 6 Training 0020260859_00...
Страница 28: ...MAKS CONDENSE 48 65 Notes 01 2018 22 Training 0020260859_00...
Страница 44: ...MAKS CONDENSE 48 65 Notes 01 2018 38 Training 0020260859_00...
Страница 110: ...MAKS CONDENSE 48 65 Notes 01 2018 104 Training 0020260859_00...
Страница 122: ...MAKS CONDENSE 48 65 Notes 01 2018 116 Training 0020260859_00...
Страница 124: ...MAKS CONDENSE 48 65 Notes 01 2018 118 Training 0020260859_00 C43P C53 C83 C83P C93 C63...
Страница 146: ...MAKS CONDENSE 48 65 Notes 01 2018 140 Training 0020260859_00...
Страница 156: ...MAKS CONDENSE 48 65 Notes 01 2018 150 Training 0020260859_00 6 4 Regional legislation...
Страница 182: ...MAKS CONDENSE 48 65 Notes 01 2018 176 Training 0020260859_00...
Страница 192: ...MAKS CONDENSE 48 65 Notes 01 2018 186 Training 0020260859_00 8 3 ErP data Data sheet that is enclosed with the product...
Страница 193: ...MAKS CONDENSE 48 65 Notes 03 2020 187 TEKN K E T M VE DESTEK...
Страница 196: ...MAKS CONDENSE 48 65 Notes 01 2018 190 Training 0020260859_00...