
MAKSİCONDENSE 48-65
Notes
03/2020
155
T
EKNİK EĞİTİM VE DESTEK
4. Unplug the ignition cable (6) and the PE connection (5).
5. Remove the power supply (4) from the ignition transformer.
6. Remove the plugs (1) and (2) from the fan motor.
7. Remove the plug (3) from the gas valve.
8. Loosen the four fixing screws (7).
9. Remove the fastening bracket (8) for the supply air pipe.
10. Remove the gas-air mixture (9) from the heat exchanger.
For assembly, carry out the steps in reverse order.
7.2.1.2 Dismantling the ignition and monitoring electrode
1. Remove connection (2) and PE connection (1).
2. Loosen the fixing screws (3).
3. Carefully remove the electrode (4) from the burner flange.
4. Replace the seal (5) during assembly.
Содержание Thema Condens AS 48-A
Страница 1: ...DEM RD K M MAKS CONDENSE 48 65...
Страница 2: ......
Страница 5: ...8 4 2 Gas consumption relating to nominal load 191 8 5 System checklist 192...
Страница 6: ......
Страница 12: ...MAKS CONDENSE 48 65 Notes 01 2018 6 Training 0020260859_00...
Страница 28: ...MAKS CONDENSE 48 65 Notes 01 2018 22 Training 0020260859_00...
Страница 44: ...MAKS CONDENSE 48 65 Notes 01 2018 38 Training 0020260859_00...
Страница 110: ...MAKS CONDENSE 48 65 Notes 01 2018 104 Training 0020260859_00...
Страница 122: ...MAKS CONDENSE 48 65 Notes 01 2018 116 Training 0020260859_00...
Страница 124: ...MAKS CONDENSE 48 65 Notes 01 2018 118 Training 0020260859_00 C43P C53 C83 C83P C93 C63...
Страница 146: ...MAKS CONDENSE 48 65 Notes 01 2018 140 Training 0020260859_00...
Страница 156: ...MAKS CONDENSE 48 65 Notes 01 2018 150 Training 0020260859_00 6 4 Regional legislation...
Страница 182: ...MAKS CONDENSE 48 65 Notes 01 2018 176 Training 0020260859_00...
Страница 192: ...MAKS CONDENSE 48 65 Notes 01 2018 186 Training 0020260859_00 8 3 ErP data Data sheet that is enclosed with the product...
Страница 193: ...MAKS CONDENSE 48 65 Notes 03 2020 187 TEKN K E T M VE DESTEK...
Страница 196: ...MAKS CONDENSE 48 65 Notes 01 2018 190 Training 0020260859_00...