
MAKSİCONDENSE 48-65
Notes
01/2018
106
Training 0020260859_00
4.2.1.4 External solenoid valve
Connecting the external solenoid valve
The external solenoid valve is actuated simultaneously with the actuation of the internal gas valve.
4.2.1.5 External heating pump
Connecting the external heating pump
The external pump is only actuated, if:
- The internal pump is actuated (mandatory condition),
- The prioritising diverter valve is in the heating position,
- A delay of 20 seconds has passed since the prioritising diverter valve was switched to the heating
position.
The external pump is not actuated:
- If the prioritising diverter valve is in the domestic hot water position or
- The internal pump is not actuated.
Содержание Thema Condens AS 48-A
Страница 1: ...DEM RD K M MAKS CONDENSE 48 65...
Страница 2: ......
Страница 5: ...8 4 2 Gas consumption relating to nominal load 191 8 5 System checklist 192...
Страница 6: ......
Страница 12: ...MAKS CONDENSE 48 65 Notes 01 2018 6 Training 0020260859_00...
Страница 28: ...MAKS CONDENSE 48 65 Notes 01 2018 22 Training 0020260859_00...
Страница 44: ...MAKS CONDENSE 48 65 Notes 01 2018 38 Training 0020260859_00...
Страница 110: ...MAKS CONDENSE 48 65 Notes 01 2018 104 Training 0020260859_00...
Страница 122: ...MAKS CONDENSE 48 65 Notes 01 2018 116 Training 0020260859_00...
Страница 124: ...MAKS CONDENSE 48 65 Notes 01 2018 118 Training 0020260859_00 C43P C53 C83 C83P C93 C63...
Страница 146: ...MAKS CONDENSE 48 65 Notes 01 2018 140 Training 0020260859_00...
Страница 156: ...MAKS CONDENSE 48 65 Notes 01 2018 150 Training 0020260859_00 6 4 Regional legislation...
Страница 182: ...MAKS CONDENSE 48 65 Notes 01 2018 176 Training 0020260859_00...
Страница 192: ...MAKS CONDENSE 48 65 Notes 01 2018 186 Training 0020260859_00 8 3 ErP data Data sheet that is enclosed with the product...
Страница 193: ...MAKS CONDENSE 48 65 Notes 03 2020 187 TEKN K E T M VE DESTEK...
Страница 196: ...MAKS CONDENSE 48 65 Notes 01 2018 190 Training 0020260859_00...