Installation
7
Logano plus SB615 - Technical specifications are subject to change without prior notice.
16
z
Wire up the electrical connections as shown in the wir-
ing diagram enclosed with the controls.
z
Use the plastic clips (Fig. 14, Item 1) to fix the cable.
They provide strain relief on the cables.
z
Fit cover plate to controller and secure with the two
screws (Fig. 13, Item 1).
z
Route capillary tubes with temperature sensors to boil-
er well, insert and push fully home.
Fig. 14
Cable strain relief
Item 1: Plastic clip
Item 2: Rear panel
7 747 015 037-10.1RS
1
2
3
4
Fig. 15
Inserting temperature sensor in boiler well
USER NOTE
Take care to ensure correct cable and capil-
lary tube routing. Do not kink capillary.
Observe the local regulations.