Installation
7
Logano plus SB615 - Technical specifications are subject to change without prior notice.
15
z
Place front boiler top panel on the side panel flanges
and pull forward until the hooks match up with the slots
on each side.
z
Insert 2 self-tapping screws through the tabs on the
front boiler top panel and the side panel flanges and
screw to the side members.
7.2
Mounting and wiring the Logamatic controls
The controls is mounted on top of the boiler and held in
place by 4 tabs and 2 screws.
z
Unscrew the two self-tapping screws (Fig. 13, Item 1)
from the top of the terminal cover plate and remove cov-
er plate.
z
Feed capillary tubes through the cable entry and unroll
to required length to reach the boiler well.
z
Fit controls in position by locating the front catches in
the oval slots, pulling the controller forward and then
tipping backward until the flexible catches on each side
snap into place (see arrows in Fig. 13).
z
Secure the controls to the boiler using the two screws
(Fig. 13, Item 3).
Fig. 12
Positioning and fixing front boiler top panel
7 747 015 037-08.1RS
Fig. 13
Fitting the Logamatic controls
Item 1: Self-tapping screws
Item 2: Top cover
Item 3: Screws
7 747 015 037-09.2RS
3
2
1
3
WARNING!
Danger: Risk of fatal injury from
electric shock!
z
Electrical work may only be carried out by
properly qualified technicians.
z
Before opening any electrical equipment,
isolate it from the power supply and take
steps to ensure the equipment can not
be switched on again uninternationally.
z
Observe the local regulations.