Servicing
9
Logano plus SB615 - Technical specifications are subject to change without prior notice.
27
z
Remove any cleaning residues with a vacuum cleaner.
z
Check seals on boiler door and baffle plate and renew
if necessary.
If spray-cleaning, follow the instructions of the
cleaning appliance.
No spray mist must be allowed to enter the control-
ler.
z
Close burner door and screw down with bolts.
z
Place baffle plate in position and fix and seal with angle
brackets (Fig. 26). Ensure it is tight all around.
z
Attach thermal insulation with clips.
z
Refit lower and upper front panels (Fig. 24).
z
Start up the system.
USER NOTE
When cleaning the secondary heat ex-
change pipes, the entire bristle part of the
brush must go right through the pipe and out
the back before the brush is pulled back
again.
Fig. 26
Removing the baffle plate and opening the boiler door
Fig. 27
Brushing out the secondary heat exchange pipes