Installation
7
Logano plus SB615 - Technical specifications are subject to change without prior notice.
20
7.5
Nameplate
z
Attach paper rating plate (Fig. 22, Item 1) to left or
right side panel according to boiler room situation.
7.6
Flue systems
z
The flue gases produced must be transported to the
outside via flue pipes and chimney flues.
z
Building code approved, moisture and condensate re-
sistant flue pipes and chimney flues must be used.
z
Before commissioning the heating system, check that
the flue system used is suitable for the boiler.
z
Follow guidelines in planning instructions.
z
Check the flue connection for leaks.
z
Follow the installation instructions of the flue system
manufacturer.
Fig. 22
Attach paper rating plate
Item 1: Rating plate
1
NOTICE:
The metal boiler plate is attached to the steel
boiler vessel behind the left front jacket pan-
el.