8
Heating system servicing
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
49
On-demand maintenance procedures
Page
Date:______
Date:______
Date:______
1.
Shutting down the heating system
38
2.
Remove and clean heat exchanger baffles
40
3.
Cleaning heat exchanger heater flue (heating surfaces) and combustion
chamber and afterwards refitting heat exchanger baffles in original positions
40
4.
Checking seals/cord gaskets on burner door and burner and replacing as
necessary
40
5.
Inspect and clean condensation heat exchanger system, replace gaskets if
necessary
40
6.
Combustion air supply and flue system
– Clean air supply system
– In the case of concentric combustion air supply and flue pipe, clean the
condensate outlet
40
7.
Start up the heating system
34
8.
Final check of the servicing work
9.
Checking safe and proper functioning in operation
Confirmation of properly completed servicing
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 17 Maintenance log
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
8.
9.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 18 Maintenance log (continued)