6
Placing the heating system in operation
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
35
6.6
Taking measurements
Allow burner to operate for 15 to 20 minutes before a
combustion test. Earlier combustion tests can lead to
incorrect readings as a result of burning off the sealant
rope. We recommend checking the burner after a few
weeks of operation.
Required instruments:
– CO
2
measuring equipment
– Draft measuring equipment
– Oil pressure gauge
– Stack thermometer
– Smoke tester
V
Check the combustion chamber pressure at the pres-
sure testing port [1].
V
Check the breeching draft at a test port in the vent con-
nector.
Fig. 35 Pressure test port on burner door
1
Pressure test port
Incorrect burner adjustment can cause con-
tamination of the boiler (e.g. soot). Faults may
occur more often than normal.
V
Always check combustion with the follow-
ing instruments.
V
Never adjust burner visually.
1
7 747 019 141-29.1RS