8
Heating system servicing
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
48
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Company
stamp/signa-
ture
Tab. 16 Servicing log (continued)
If any condition requiring maintenance work
is identified in the course of servicing, that
work must be carried out as required.